BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//theknighted//Env_Markets Regulatory Calendar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Env_Markets Regulatory Calendar
X-WR-TIMEZONE:UTC
BEGIN:VEVENT
UID:e3a3fb66a629@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220801
DTEND;VALUE=DATE:20220802
SUMMARY:[REC_CA_PCC1] CA RPS Annual Compliance Report due to CPUC - PCC1 (
 bundled) — Compliance
DESCRIPTION:California RPS PCC1 (bundled\, delivered) (CPUC / CEC)\nType: 
 Compliance\nStatus: Confirmed\nPCC1 = RPS-eligible generation interconnec
 ted to / scheduled into a CA balancing authority (bundled\, delivered). R
 etail sellers (IOUs/ESPs/CCAs) file the Annual RPS Compliance Report by A
 ug 1 (D.12-06-038)\; measured over 3-year compliance periods\; WREGIS-tra
 cked\; SB 100: 60% by 2030.\nSource: https://www.cpuc.ca.gov/industries-a
 nd-topics/electrical-energy/electric-power-procurement/rps/rps-compliance
 -rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d379eac42c2d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220801
DTEND;VALUE=DATE:20220802
SUMMARY:[REC_CA_PCC2] CA RPS Annual Compliance Report due to CPUC - PCC2 (
 firmed & shaped) — Compliance
DESCRIPTION:California RPS PCC2 (firmed & shaped) (CPUC / CEC)\nType: Comp
 liance\nStatus: Confirmed\nPCC2 = firmed-and-shaped / incremental electri
 city with substitute energy. Same Aug 1 CPUC Annual RPS Compliance Report
  (D.12-06-038)\; WREGIS-tracked.\nSource: https://www.cpuc.ca.gov/industr
 ies-and-topics/electrical-energy/electric-power-procurement/rps/rps-compl
 iance-rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:143f5c57d33b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220801
DTEND;VALUE=DATE:20220802
SUMMARY:[REC_CA_PCC3] CA RPS Annual Compliance Report due to CPUC - PCC3 (
 unbundled RECs) — Compliance
DESCRIPTION:California RPS PCC3 (unbundled / TRECs) (CPUC / CEC)\nType: Co
 mpliance\nStatus: Confirmed\nPCC3 = unbundled RECs (TRECs) and products n
 ot qualifying as PCC1/PCC2 - the tradable category\, subject to a procure
 ment cap and portfolio-balance limits. Same Aug 1 CPUC Annual RPS Complia
 nce Report (D.12-06-038).\nSource: https://www.cpuc.ca.gov/industries-and
 -topics/electrical-energy/electric-power-procurement/rps/rps-compliance-r
 ules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ccd7ab2406b5@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220831
DTEND;VALUE=DATE:20220901
SUMMARY:[REC_VT] VT Renewable Energy Standard annual compliance filing due
  to PUC — Compliance
DESCRIPTION:Vermont RECs / RPS (Vermont PUC / RPS program)\nType: Complian
 ce\nStatus: Confirmed\nDistribution utilities file by Aug 31 (PUC Docket 
 8550)\; Tiers I/II met by retiring NEPOOL GIS RECs\, plus Tier III energy
  transformation. No retail choice in VT.\nSource: https://publicservice.v
 ermont.gov/renewables/renewable-energy-standard
URL:https://publicservice.vermont.gov/renewables/renewable-energy-standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:118544ba8243@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220901
DTEND;VALUE=DATE:20220902
SUMMARY:[REC_NC] NC REPS/CEPS compliance plan + report due to NCUC — Comp
 liance
DESCRIPTION:North Carolina RECs / RPS (North Carolina PUC / RPS program)\n
 Type: Compliance\nStatus: Confirmed\nElectric power suppliers file the fo
 rward compliance plan (Rule R8-67(b)) and prior-year compliance report (R
 8-67(c)) by Sept 1\; retail-sales data entered into NC-RETS by June 1\; I
 OU target 12.5%\; expanded to CEPS by SL 2023-138\; RECs tracked in NC-RE
 TS.\nSource: https://www.ncuc.gov/Reps/reps.html
URL:https://www.ncuc.gov/Reps/reps.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fc237b0614d8@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220901
DTEND;VALUE=DATE:20220902
SUMMARY:[REC_PA] PA AEPS true-up period closes (Tier I/II + solar) — Comp
 liance
DESCRIPTION:Pennsylvania RECs / RPS (Pennsylvania PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nThree-month true-up from the May 31 repo
 rting-year close\; after this the PUC verifies compliance and assesses AC
 P/SACP.\nSource: https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
URL:https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e300c1b4e360@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220901
DTEND;VALUE=DATE:20220902
SUMMARY:[TIER] Facility-specific benchmark applications due (upcoming year
 ) — Deadline
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Deadline\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-in
 novation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cc6e8a318c9e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220928
DTEND;VALUE=DATE:20220929
SUMMARY:[REC_DE] DE RPS compliance report due (~120 days after May 31 clos
 e) — Compliance
DESCRIPTION:Delaware RECs / RPS (Delaware PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nStandard-offer RPS obligation sits with Delmarva
 \; transitional-contract RECs transfer to the standard offer by Aug 1 (90
 %) and Sep 1\; 26 Del. Admin. C. 3008.\nSource: https://depsc.delaware.go
 v/rps-and-green-power-product-compliance/
URL:https://depsc.delaware.gov/rps-and-green-power-product-compliance/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:640bc6a33a9f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20220930
DTEND;VALUE=DATE:20221001
SUMMARY:[EU_ETS] Surrender allowances for the prior year's emissions — Co
 mpliance
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Compl
 iance\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/
 carbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:39ea7163abf2@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20221001
DTEND;VALUE=DATE:20221002
SUMMARY:[REC_NJ] NJ RPS annual compliance report due to BPU (EY Jun 1-May 
 31) — Compliance
DESCRIPTION:New Jersey RECs / RPS (New Jersey PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual report demonstrating Class I\, Class 
 II and solar (SREC-II/SuSI) compliance for the prior Energy Year\; N.J.A.
 C. 14:8-2.2.\nSource: https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-
 19-15-8A.pdf
URL:https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-19-15-8A.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2c3162fc13d4@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20221015
DTEND;VALUE=DATE:20221016
SUMMARY:[REC_CT] CT RPS annual compliance filing (Exhibit A) due to PURA 
 — Compliance
DESCRIPTION:Connecticut RECs / RPS (Connecticut PUC / RPS program)\nType: 
 Compliance\nStatus: Confirmed\nDue Oct 15 of the year following the compl
 iance year (docket YEAR-06-01)\; Class I/II/III RECs settle via NEPOOL GI
 S by June 15.\nSource: https://portal.ct.gov/-/media/pura/electric/el-add
 s/master-rps--instructions---final92225.pdf
URL:https://portal.ct.gov/-/media/pura/electric/el-adds/master-rps--instru
 ctions---final92225.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:721931819b02@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20221031
DTEND;VALUE=DATE:20221101
SUMMARY:[AU_SAFEGUARD] NGER emissions and energy report due (prior financi
 al year) — Reporting
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Reporting\nStatus: Confirmed\nSource: https://www.dcceew.gov.au/
 climate-change/emissions-reporting/national-greenhouse-energy-reporting-s
 cheme/safeguard-mechanism
URL:https://www.dcceew.gov.au/climate-change/emissions-reporting/national-
 greenhouse-energy-reporting-scheme/safeguard-mechanism
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:787d994ee967@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20221101
DTEND;VALUE=DATE:20221102
SUMMARY:[CCA] Annual compliance obligation surrender (approx.) — Complian
 ce
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Compliance\nStatus: Te
 ntative\nAnnual partial-surrender window\; full true-up at the close of e
 ach compliance period.\nSource: https://ww2.arb.ca.gov/our-work/programs/
 cap-and-trade-program
URL:https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-program
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1b4d129dd64e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20221101
DTEND;VALUE=DATE:20221102
SUMMARY:[NG_ACER_GAS] EU gas storage 90% filling target (reference date) 
 — Compliance
DESCRIPTION:ACER Gas (ACER)\nType: Compliance\nStatus: Confirmed\nUnder Re
 gulation (EU) 2025/1733 the 90% storage target may be met any time betwee
 n 1 October and 1 December (replacing the former hard 1 November deadline
 )\, with limited deviations allowed\; in force through 2027. 1 November s
 hown as the reference benchmark.\nSource: https://energy.ec.europa.eu/top
 ics/energy-security/gas-storage_en
URL:https://energy.ec.europa.eu/topics/energy-security/gas-storage_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:edd4be64f26f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20221101
DTEND;VALUE=DATE:20221102
SUMMARY:[WCA] Annual compliance deadline (30% of prior-year emissions\, 5 
 p.m. PT) — Compliance
DESCRIPTION:Washington Cap-and-Invest (Washington Department of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nRemaining obligation due at the clos
 e of each four-year compliance period.\nSource: https://ecology.wa.gov/ai
 r-climate/climate-commitment-act/cap-and-invest/auctions-and-market/compl
 iance
URL:https://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-inve
 st/auctions-and-market/compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:46abb472395f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20221130
DTEND;VALUE=DATE:20221201
SUMMARY:[RINS] EPA statutory deadline to set the following year's RVO volu
 mes — Milestone
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Milestone\nStatus:
  Tentative\nEPA frequently misses this statutory date\; treat as a target
 \, not a fixed event.\nSource: https://www.congress.gov/crs-product/R43325
URL:https://www.congress.gov/crs-product/R43325
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:baa99cd6d3c5@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20221215
DTEND;VALUE=DATE:20221216
SUMMARY:[CA_OBPS] Regular-rate compensation deadline (excess emissions) —
  Compliance
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Compliance\nStatus: Confirmed\nIncreased-rate deadline follows in mi
 d-February\; CAD 110/t excess-emissions charge for 2026.\nSource: https:/
 /icapcarbonaction.com/en/ets/canada-federal-output-based-pricing-system
URL:https://icapcarbonaction.com/en/ets/canada-federal-output-based-pricin
 g-system
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1583762f2e0f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230225
DTEND;VALUE=DATE:20230226
SUMMARY:[NESO] GB Capacity Market T-4 and T-1 auctions — Auction
DESCRIPTION:National Energy System Operator (Great Britain) (NESO)\nType: 
 Auction\nStatus: Tentative\nAnnual four-year-ahead (T-4) and one-year-ahe
 ad (T-1) capacity auctions\, typically held late February to early March\
 ; exact dates and parameters are set each cycle by DESNZ and NESO.\nSourc
 e: https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
URL:https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9305d83d3ebb@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230228
DTEND;VALUE=DATE:20230301
SUMMARY:[EU_ETS] Free allocation entered in the Union Registry (approx.) 
 — Allocation
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Alloc
 ation\nStatus: Tentative\nTypically end of February\; confirm against the
  annual allocation timetable.\nSource: https://icapcarbonaction.com/en/et
 s/eu-emissions-trading-system-eu-ets
URL:https://icapcarbonaction.com/en/ets/eu-emissions-trading-system-eu-ets
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:42607f25f7d9@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230315
DTEND;VALUE=DATE:20230316
SUMMARY:[TIER] Forecasting report update due (prior data year) — Reportin
 g
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-i
 nnovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ece677806b62@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230326
DTEND;VALUE=DATE:20230327
SUMMARY:[MISO] Planning Resource Auction - offer window (last four busines
 s days of March) — Auction
DESCRIPTION:Midcontinent Independent System Operator (MISO)\nType: Auction
 \nStatus: Tentative\nMISO accepts PRA offers in the last four business da
 ys of March and posts results in late April (April 28 in 2026). Seasonal 
 accreditation applies\; exact days vary.\nSource: https://www.misoenergy.
 org/planning/resource-adequacy2/resource-adequacy/
URL:https://www.misoenergy.org/planning/resource-adequacy2/resource-adequa
 cy/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:92602d3c6009@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[AU_SAFEGUARD] Safeguard compliance deadline (surrender ACCUs / SM
 Cs for excess) — Compliance
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Compliance\nStatus: Confirmed\nNet emissions must be at or below
  baseline\; compliance assessed as of 1 April.\nSource: https://cer.gov.a
 u/about-us/our-compliance-approach/compliance-and-enforcement-priorities/
 compliance-and-enforcement-priorities-2025-26
URL:https://cer.gov.au/about-us/our-compliance-approach/compliance-and-enf
 orcement-priorities/compliance-and-enforcement-priorities-2025-26
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:04a8c9f46f68@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[BC_LCFS] Annual compliance report due (prior compliance year) — 
 Compliance
DESCRIPTION:BC Low Carbon Fuels (BC Ministry of Energy and Climate Solutio
 ns)\nType: Compliance\nStatus: Confirmed\nCompliance period aligns with t
 he calendar year\; reports due on or before March 31.\nSource: https://ww
 w2.gov.bc.ca/gov/content/industry/electricity-alternative-energy/transpor
 tation-energies/renewable-low-carbon-fuels/requirements
URL:https://www2.gov.bc.ca/gov/content/industry/electricity-alternative-en
 ergy/transportation-energies/renewable-low-carbon-fuels/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f649a04e4a32@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[EU_ETS] Report verified emissions for the prior year (Union Regis
 try) — Reporting
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Repor
 ting\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/c
 arbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:59290c69364a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[LCFS] Annual compliance / fuel pathway report due (prior data yea
 r) — Reporting
DESCRIPTION:Low Carbon Fuel Standard (CARB)\nType: Reporting\nStatus: Conf
 irmed\nSource: https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-s
 tandard/lcfs-registration-and-reporting
URL:https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-standard/lcfs
 -registration-and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3f1ce36c8f11@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[REC_HI] HI RPS annual status report to PUC (Docket 2007-0008) — 
 Reporting
DESCRIPTION:Hawaii RECs / RPS (Hawaii PUC / RPS program)\nType: Reporting\
 nStatus: Tentative\nHECO companies and KIUC file annual RPS status report
 s with the PUC under HRS 269-95\; 100% by 2045 on a net-generation basis 
 (Act 140\, 2022). Islanded grids - no external REC trading market. Exact 
 statutory filing date varies\; approximate marker.\nSource: https://puc.h
 awaii.gov/reports/energy-reports/renewable-portfolio-standards-rps-annual
 -reports/
URL:https://puc.hawaii.gov/reports/energy-reports/renewable-portfolio-stan
 dards-rps-annual-reports/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ae22a3785825@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[REC_ME] ME PUC annual RPS report (CEP compliance reports feed in)
  — Reporting
DESCRIPTION:Maine RECs / RPS (Maine PUC / RPS program)\nType: Reporting\nS
 tatus: Tentative\nMaine PUC publishes its annual RPS report to the Legisl
 ature ~Mar 31 (35-A M.R.S. 3210)\; competitive electricity providers self
 -report and settle RECs via NEPOOL GIS. Exact CEP filing date set by PUC 
 instructions.\nSource: https://www.maine.gov/mpuc/regulated-utilities/ele
 ctricity/renewable-programs/rps
URL:https://www.maine.gov/mpuc/regulated-utilities/electricity/renewable-p
 rograms/rps
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c2fc1ed6fe22@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[REC_NY] NY Clean Energy Standard annual reconciliation (Tier 1/Ti
 er 4/ZEC) — True-up
DESCRIPTION:New York RECs / RPS (New York PUC / RPS program)\nType: True-u
 p\nStatus: Tentative\nPay-as-you-go: LSEs remit monthly obligation paymen
 ts to NYSERDA within 15 days of invoice\; after the Jan 1-Dec 31 complian
 ce year NYSERDA reconciles against final NYISO load. Annual reconciliatio
 n date varies\; ZEC runs on a fiscal-year basis. Tracked in NYGATS.\nSour
 ce: https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obl
 igations/Compliance
URL:https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obli
 gations/Compliance
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:16da1674ccfa@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[UK_ETS] Verified annual emissions report due — Reporting
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.gov.uk/government/publi
 cations/participating-in-the-uk-ets/participating-in-the-uk-ets
URL:https://www.gov.uk/government/publications/participating-in-the-uk-ets
 /participating-in-the-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cbb3c25f2ffe@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230331
DTEND;VALUE=DATE:20230401
SUMMARY:[WA_CFS] Q4 quarterly report due (prior year) — Reporting
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Reporting\nStatus: Confirmed\nQuarterly reports are due about 90 da
 ys after each quarter-end\; March 31 is the Q4 deadline.\nSource: https:/
 /ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/clean-fuel-
 standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fcd0cd793e26@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230401
DTEND;VALUE=DATE:20230402
SUMMARY:[REC_DC] DC RPS supplier compliance report due to DCPSC (prior cal
 endar year) — Compliance
DESCRIPTION:Washington DC RECs / RPS (Washington DC PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nDue by April 1 of the year following t
 he compliance year\; high-value solar carve-out (DC SRECs)\; DCMR Title 1
 5\, Ch. 29.\nSource: https://dcpsc.org/getattachment/Orders-and-Regulatio
 ns/Orders-Rules-and-Regulations/District-of-Columbia-Municipal-Regulation
 s-Title-1/15-29-Compiled-(Updated-April-2022).pdf.aspx?lang=en-US
URL:https://dcpsc.org/getattachment/Orders-and-Regulations/Orders-Rules-an
 d-Regulations/District-of-Columbia-Municipal-Regulations-Title-1/15-29-Co
 mpiled-(Updated-April-2022).pdf.aspx?lang=en-US
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b196c5cdd7a3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230401
DTEND;VALUE=DATE:20230402
SUMMARY:[REC_MD] MD RPS supplier compliance report due to PSC (prior calen
 dar year) — Compliance
DESCRIPTION:Maryland RECs / RPS (Maryland PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nOn or before April 1 each supplier files its RPS
  report and retires Tier 1/Tier 1 solar/Tier 2 RECs\; COMAR 20.61.04.02.\
 nSource: https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-
 02
URL:https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-02
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:53a9d7811c7d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230415
DTEND;VALUE=DATE:20230416
SUMMARY:[REC_MO] MO RES annual compliance report due to PSC (prior calenda
 r year) — Compliance
DESCRIPTION:Missouri RECs / RPS (Missouri PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nInvestor-owned utilities (Ameren Missouri\, Ever
 gy\, Empire) file annual RES compliance reports and forward compliance pl
 ans under 20 CSR 4240-20.100\; 15% by 2021 with a 2% solar carve-out and 
 a 1% rate-impact cap\; RECs tracked in MRETS.\nSource: https://psc.mo.gov
 /electric/Renewable_Energy_Standard_Compliance_Reports
URL:https://psc.mo.gov/electric/Renewable_Energy_Standard_Compliance_Repor
 ts
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1f3b360b5306@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230415
DTEND;VALUE=DATE:20230416
SUMMARY:[REC_OH] OH renewable portfolio annual status report due to PUCO (
 prior year) — Compliance
DESCRIPTION:Ohio RECs / RPS (Ohio PUC / RPS program)\nType: Compliance\nSt
 atus: Confirmed\nEDUs and CRES providers file by April 15\; standard caps
  at 8.5% by 2026\; OAC 4901:1-40-05.\nSource: https://puco.ohio.gov/utili
 ties/electricity/resources/ohio-renewable-energy-portfolio-standard/rps-f
 iling-faqs
URL:https://puco.ohio.gov/utilities/electricity/resources/ohio-renewable-e
 nergy-portfolio-standard/rps-filing-faqs
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f8177ccc0d40@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230415
DTEND;VALUE=DATE:20230416
SUMMARY:[REC_WI] WI RPS annual compliance demonstration due to PSCW (prior
  calendar year) — Compliance
DESCRIPTION:Wisconsin RECs / RPS (Wisconsin PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nElectric providers demonstrate compliance by A
 pril 15 by retiring RECs/RRCs in M-RETS\; Wis. Stat. 196.378. Statewide 1
 0% goal (2015) met\; provider-specific baseline+6% requirements continue 
 indefinitely.\nSource: https://psc.wi.gov/Pages/ServiceType/Energy/Renewa
 bles/RpsCompliance.aspx
URL:https://psc.wi.gov/Pages/ServiceType/Energy/Renewables/RpsCompliance.a
 spx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bd1a127341da@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230418
DTEND;VALUE=DATE:20230419
SUMMARY:[NG_FERC] FERC Form 2 / 2-A annual report due (interstate gas pipe
 lines) — Reporting
DESCRIPTION:FERC Natural Gas (FERC)\nType: Reporting\nStatus: Confirmed\nA
 nnual financial and operational report for major / non-major interstate n
 atural gas pipelines\; due April 18 of the following year under 18 CFR 26
 0.1-260.2.\nSource: https://www.ferc.gov/industries-data/natural-gas/indu
 stry-forms
URL:https://www.ferc.gov/industries-data/natural-gas/industry-forms
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1f6e2a72e7c9@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230430
DTEND;VALUE=DATE:20230501
SUMMARY:[CFR] Annual Credit Creation Report due (CATS) — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nCC1 and CC3 credits are created on April 30 with this report\; CI-Pa
 thway Reports share this deadline.\nSource: https://data-donnees.az.ec.gc
 .ca/data/climate/products/clean-fuel-regulations-credit-market-reporting?
 lang=en
URL:https://data-donnees.az.ec.gc.ca/data/climate/products/clean-fuel-regu
 lations-credit-market-reporting?lang=en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:36aa51164f9f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230430
DTEND;VALUE=DATE:20230501
SUMMARY:[OR_CFP] Annual compliance report due (balance credits and deficit
 s) — Compliance
DESCRIPTION:Oregon Clean Fuels Program (Oregon DEQ)\nType: Compliance\nSta
 tus: Tentative\nLCFS-family April 30 standard\; confirm on Oregon DEQ's C
 FP calendar. Quarterly progress reports are due about 90 days after each 
 quarter-end.\nSource: https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overv
 iew.aspx
URL:https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overview.aspx
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:50e401b30ccb@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230430
DTEND;VALUE=DATE:20230501
SUMMARY:[UK_ETS] Surrender allowances for the prior scheme year — Complia
 nce
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Compliance\nStatus: Confirmed\nA double-surrender easing applies for the 
 2026-2027 maritime years (both due 30 April 2028).\nSource: https://icapc
 arbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
URL:https://icapcarbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fc9b97cbbc12@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230430
DTEND;VALUE=DATE:20230501
SUMMARY:[WA_CFS] Annual compliance report due (prior compliance year) — C
 ompliance
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nSource: https://ecology.wa.gov/air-c
 limate/reducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fc5ab599d003@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230501
DTEND;VALUE=DATE:20230502
SUMMARY:[REC_MN] MN RES/Solar Standard REC retirement deadline (prior cale
 ndar year) — Compliance
DESCRIPTION:Minnesota RECs / RPS (Minnesota PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nRECs for the prior compliance year retired in 
 M-RETS by May 1\; annual verification report (RES\, Solar Energy Standard
 \, Green Pricing) filed with the PUC by June 1. 2023 law: 55% renewable b
 y 2035\, 100% carbon-free by 2040\; REC shelf life = generation year + 4.
 \nSource: https://mn.gov/commerce-stat/energy/industry-government/utiliti
 es/annual-reporting/notice_26-12_final_signed.pdf
URL:https://mn.gov/commerce-stat/energy/industry-government/utilities/annu
 al-reporting/notice_26-12_final_signed.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c0ef0b7c5743@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230501
DTEND;VALUE=DATE:20230502
SUMMARY:[REC_VA] VA VCEA RPS annual development plan filed with SCC (Domin
 ion ~May 1) — Compliance
DESCRIPTION:Virginia RECs / RPS (Virginia PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nProceeding-based: Dominion (~May 1) and APCo (la
 te April) file annual RPS development plans (Va. Code 56-585.5(D))\; comp
 liance demonstrated by retiring RECs every year via PJM-GATS\; 100% by 20
 45 (Dominion) / 2050 (APCo)\; from 2025\, 75% of Dominion's RECs must be 
 Virginia-sited.\nSource: https://www.scc.virginia.gov/regulated-industrie
 s/utility-regulation/energy-regulation/renewable-resources/arbs/
URL:https://www.scc.virginia.gov/regulated-industries/utility-regulation/e
 nergy-regulation/renewable-resources/arbs/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1f5e5760636b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230601
DTEND;VALUE=DATE:20230602
SUMMARY:[CA_OBPS] Annual report and verification report due — Reporting
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Reporting\nStatus: Confirmed\nFederal OBPS now applies only in Manit
 oba\, PEI\, Yukon and Nunavut\; most large emitters sit under provincial 
 systems.\nSource: https://www.canada.ca/en/environment-climate-change/ser
 vices/climate-change/pricing-pollution-how-it-will-work/output-based-pric
 ing-system.html
URL:https://www.canada.ca/en/environment-climate-change/services/climate-c
 hange/pricing-pollution-how-it-will-work/output-based-pricing-system.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3fc31ed2228f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230601
DTEND;VALUE=DATE:20230602
SUMMARY:[QC_CAT] Annual verified GHG emissions report (SGE GES) — Reporti
 ng
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Reporti
 ng\nStatus: Tentative\nApproximate\; confirm the exact Quebec reporting d
 ate.\nSource: https://www.environnement.gouv.qc.ca/changementsclimatiques
 /marche-carbone_en.asp
URL:https://www.environnement.gouv.qc.ca/changementsclimatiques/marche-car
 bone_en.asp
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e9a7161f1b70@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230601
DTEND;VALUE=DATE:20230602
SUMMARY:[REC_CO] CO RES annual compliance report due to PUC (prior calenda
 r year) — Compliance
DESCRIPTION:Colorado RECs / RPS (Colorado PUC / RPS program)\nType: Compli
 ance\nStatus: Tentative\nQualifying retail utilities (Xcel/Public Service
 \, Black Hills) and wholesale utilities (Tri-State) file annual RES compl
 iance reports under PUC Rule 3662 (4 CCR 723-3) ~June 1\, plus forward co
 mpliance plans\; 30% by 2020 (IOUs)\; SB19-236 clean-energy 80% by 2030 /
  100% by 2050 goals\; WREGIS-tracked. Exact date approximate.\nSource: ht
 tps://puc.colorado.gov/utilityforms
URL:https://puc.colorado.gov/utilityforms
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:65f2dc606adf@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230601
DTEND;VALUE=DATE:20230602
SUMMARY:[REC_IL] IL RPS delivery year begins (Jun 1-May 31) - IPA-procured
  — Milestone
DESCRIPTION:Illinois RECs / RPS (Illinois PUC / RPS program)\nType: Milest
 one\nStatus: Confirmed\nIllinois RPS is procurement-based: the Illinois P
 ower Agency procures RECs for ComEd/Ameren/MidAmerican via its Long-Term 
 Plan (Illinois Shines/ABP). Per-supplier ARES REC obligations phased out 
 after the 2018-19 delivery year. Indexed-REC procurements run on calendar
  years\; other procurements on the delivery year.\nSource: https://ipa.il
 linois.gov/renewable-resources.html
URL:https://ipa.illinois.gov/renewable-resources.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ce6a4241f058@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230601
DTEND;VALUE=DATE:20230602
SUMMARY:[REC_OR] OR RPS annual compliance report due to OPUC (prior calend
 ar year) — Compliance
DESCRIPTION:Oregon RECs / RPS (Oregon PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nIOUs and electricity service suppliers file by June 
 1 (ORS 469A)\; consumer-owned utilities report to their boards/members\; 
 RECs retired via WREGIS\; ACP option under a 4% cost cap\; large utilitie
 s 50% by 2040 (SB 1547). RPS Implementation Plan filed Jan 1 of even year
 s.\nSource: https://www.oregon.gov/energy/energy-oregon/pages/renewable-p
 ortfolio-standard.aspx
URL:https://www.oregon.gov/energy/energy-oregon/pages/renewable-portfolio-
 standard.aspx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fbaa8d39eef0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230601
DTEND;VALUE=DATE:20230602
SUMMARY:[REC_WA] WA Energy Independence Act annual report due to Commerce 
 (prior year) — Reporting
DESCRIPTION:Washington RECs / RPS (Washington PUC / RPS program)\nType: Re
 porting\nStatus: Confirmed\nQualifying utilities report annually by June 
 1 (RCW 19.285)\; the 15% renewable target was met (2020). CETA (RCW 19.40
 5) layers a 100%-clean-by-2045 obligation via 4-year Clean Energy Impleme
 ntation Plans and multi-year compliance periods (first CETA interim perfo
 rmance report due July 1\, 2026).\nSource: https://www.utc.wa.gov/regulat
 ed-industries/utilities/energy/conservation-and-renewable-energy-overview
 /washington-energy-independence-act-i-937
URL:https://www.utc.wa.gov/regulated-industries/utilities/energy/conservat
 ion-and-renewable-energy-overview/washington-energy-independence-act-i-937
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1f1af87f918f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230601
DTEND;VALUE=DATE:20230602
SUMMARY:[RINS] RFS attest engagement report (RFS 0304T) due — Reporting
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Reporting\nStatus:
  Tentative\nGenerally June 1 following the compliance year\; the exact ye
 ar tracks the compliance-deadline timing.\nSource: https://www.epa.gov/re
 newable-fuel-standard/extension-renewable-fuel-standard-compliance-deadli
 nes-final-rulemaking
URL:https://www.epa.gov/renewable-fuel-standard/extension-renewable-fuel-s
 tandard-compliance-deadlines-final-rulemaking
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0e8b654c518b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230601
DTEND;VALUE=DATE:20230602
SUMMARY:[WA_CFS] Credit Clearance Market window opens\, if required — Mil
 estone
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Milestone\nStatus: Tentative\nRuns June 1 to July 31\; held only if
  parties have unmet obligations (determined by May 15). Max price set by 
 the first Monday of April.\nSource: https://ecology.wa.gov/air-climate/re
 ducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:552c2f9eaa2e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230630
DTEND;VALUE=DATE:20230701
SUMMARY:[CFR] Credit-adjustment report due — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nSource: https://www.ccarbon.info/news/eccc-releases-detailed-factshe
 et-on-carbon-intensity-pathway-reports-for-clean-fuel-regulations/
URL:https://www.ccarbon.info/news/eccc-releases-detailed-factsheet-on-carb
 on-intensity-pathway-reports-for-clean-fuel-regulations/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:407690771b78@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230630
DTEND;VALUE=DATE:20230701
SUMMARY:[REC_MI] MI renewable energy annual compliance report due to MPSC 
 (prior year) — Reporting
DESCRIPTION:Michigan RECs / RPS (Michigan PUC / RPS program)\nType: Report
 ing\nStatus: Confirmed\nElectric providers retire RECs in MIRECS at year-
 end and file annual compliance reports in their renewable-energy-plan doc
 kets by June 30\; PA 235 (2023): RPS 50% by 2030\, 60% by 2035\, Clean En
 ergy Standard 100% by 2040\; REP plans filed biennially.\nSource: https:/
 /www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
URL:https://www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2d0847c0dbbe@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230630
DTEND;VALUE=DATE:20230701
SUMMARY:[TIER] Verified annual compliance report and true-up obligation du
 e — Compliance
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Compliance\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-
 innovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:536d454d91d6@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230701
DTEND;VALUE=DATE:20230702
SUMMARY:[CR_FERC_OIL] FERC oil pipeline index rate-ceiling adjustment take
 s effect — Effective date
DESCRIPTION:FERC Oil Pipeline Tariffs (FERC)\nType: Effective date\nStatus
 : Confirmed\nInterstate oil pipeline rate ceilings adjust each July 1 by 
 the FERC index (PPI-FG - 0.55% for the July 1\, 2026 - June 30\, 2031 ter
 m)\; FERC publishes the annual multiplier in May.\nSource: https://www.fe
 rc.gov/general-information-1/oil-pipeline-index
URL:https://www.ferc.gov/general-information-1/oil-pipeline-index
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e9764d62c129@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230701
DTEND;VALUE=DATE:20230702
SUMMARY:[REC_MA] MA RPS/APS annual compliance filing due to DOER (prior ca
 lendar year) — Compliance
DESCRIPTION:Massachusetts RECs / RPS (Massachusetts PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nCovers RPS Class I/II\, APS\, CES and 
 CPS\; due July 1 (or next business day)\; 225 CMR 14.09/15.09/16.09.\nSou
 rce: https://www.mass.gov/info-details/annual-compliance-reports-and-othe
 r-publications
URL:https://www.mass.gov/info-details/annual-compliance-reports-and-other-
 publications
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b6955e0ba863@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230701
DTEND;VALUE=DATE:20230702
SUMMARY:[REC_NM] NM Renewable Energy Act procurement plan + portfolio repo
 rt due to PRC — Compliance
DESCRIPTION:New Mexico RECs / RPS (New Mexico PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual procurement plan and prior-year portf
 olio report filed on a staggered schedule (El Paso Electric May 1\, PNM J
 une 1\, SPS July 1) under Rule 572 / 62-16-4 NMSA\; ETA 2019: 50% by 2030
 \, 80% by 2040\, 100% carbon-free by 2045\; WREGIS\; RECs carry forward u
 p to 4 years.\nSource: https://www.prc.nm.gov/utilities/renewable-energy/
URL:https://www.prc.nm.gov/utilities/renewable-energy/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b83fc5f373fb@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230701
DTEND;VALUE=DATE:20230702
SUMMARY:[REC_NV] NV RPS annual compliance report due to PUCN (prior calend
 ar year) — Compliance
DESCRIPTION:Nevada RECs / RPS (Nevada PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nProviders of electric service file by July 1 (NRS 70
 4.7825)\; 50% by 2030 / 100% carbon-free goal by 2050\; portfolio energy 
 credits (PECs)\; EE counts toward up to 10% (phasing out for 2025+).\nSou
 rce: https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
URL:https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b97b102bc832@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230715
DTEND;VALUE=DATE:20230716
SUMMARY:[REC_NH] NH RPS annual compliance filing (Form E-2500) due to Dept
  of Energy — Compliance
DESCRIPTION:New Hampshire RECs / RPS (New Hampshire PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nFiled in the July 1-15 window (RSA 362
 -F:8 as amended by HB 2 sec. 112\, effective 2023)\; Classes I-IV\; NEPOO
 L GIS.\nSource: https://www.energy.nh.gov/renewable-energy/renewable-port
 folio-standard/renewable-portfolio-standard-compliance
URL:https://www.energy.nh.gov/renewable-energy/renewable-portfolio-standar
 d/renewable-portfolio-standard-compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dda790885654@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230715
DTEND;VALUE=DATE:20230716
SUMMARY:[REC_RI] RI Renewable Energy Standard compliance filing due to PUC
  — Compliance
DESCRIPTION:Rhode Island RECs / RPS (Rhode Island PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nWithin 30 days after Q4 NEPOOL GIS repor
 ts (no later than July 15)\; ACP to the Renewable Energy Development Fund
 \; 810-RICR-40-05-2.\nSource: https://ripuc.ri.gov/utility-information/el
 ectric/rhode-island-renewable-energy-standard-ri-res-program
URL:https://ripuc.ri.gov/utility-information/electric/rhode-island-renewab
 le-energy-standard-ri-res-program
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b3fc96c961d6@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230801
DTEND;VALUE=DATE:20230802
SUMMARY:[REC_CA_PCC1] CA RPS Annual Compliance Report due to CPUC - PCC1 (
 bundled) — Compliance
DESCRIPTION:California RPS PCC1 (bundled\, delivered) (CPUC / CEC)\nType: 
 Compliance\nStatus: Confirmed\nPCC1 = RPS-eligible generation interconnec
 ted to / scheduled into a CA balancing authority (bundled\, delivered). R
 etail sellers (IOUs/ESPs/CCAs) file the Annual RPS Compliance Report by A
 ug 1 (D.12-06-038)\; measured over 3-year compliance periods\; WREGIS-tra
 cked\; SB 100: 60% by 2030.\nSource: https://www.cpuc.ca.gov/industries-a
 nd-topics/electrical-energy/electric-power-procurement/rps/rps-compliance
 -rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f9b9c84e3a20@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230801
DTEND;VALUE=DATE:20230802
SUMMARY:[REC_CA_PCC2] CA RPS Annual Compliance Report due to CPUC - PCC2 (
 firmed & shaped) — Compliance
DESCRIPTION:California RPS PCC2 (firmed & shaped) (CPUC / CEC)\nType: Comp
 liance\nStatus: Confirmed\nPCC2 = firmed-and-shaped / incremental electri
 city with substitute energy. Same Aug 1 CPUC Annual RPS Compliance Report
  (D.12-06-038)\; WREGIS-tracked.\nSource: https://www.cpuc.ca.gov/industr
 ies-and-topics/electrical-energy/electric-power-procurement/rps/rps-compl
 iance-rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cd16f3c2006d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230801
DTEND;VALUE=DATE:20230802
SUMMARY:[REC_CA_PCC3] CA RPS Annual Compliance Report due to CPUC - PCC3 (
 unbundled RECs) — Compliance
DESCRIPTION:California RPS PCC3 (unbundled / TRECs) (CPUC / CEC)\nType: Co
 mpliance\nStatus: Confirmed\nPCC3 = unbundled RECs (TRECs) and products n
 ot qualifying as PCC1/PCC2 - the tradable category\, subject to a procure
 ment cap and portfolio-balance limits. Same Aug 1 CPUC Annual RPS Complia
 nce Report (D.12-06-038).\nSource: https://www.cpuc.ca.gov/industries-and
 -topics/electrical-energy/electric-power-procurement/rps/rps-compliance-r
 ules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:acec75e7b20e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230831
DTEND;VALUE=DATE:20230901
SUMMARY:[REC_VT] VT Renewable Energy Standard annual compliance filing due
  to PUC — Compliance
DESCRIPTION:Vermont RECs / RPS (Vermont PUC / RPS program)\nType: Complian
 ce\nStatus: Confirmed\nDistribution utilities file by Aug 31 (PUC Docket 
 8550)\; Tiers I/II met by retiring NEPOOL GIS RECs\, plus Tier III energy
  transformation. No retail choice in VT.\nSource: https://publicservice.v
 ermont.gov/renewables/renewable-energy-standard
URL:https://publicservice.vermont.gov/renewables/renewable-energy-standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:70df0b3a58d8@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230901
DTEND;VALUE=DATE:20230902
SUMMARY:[REC_NC] NC REPS/CEPS compliance plan + report due to NCUC — Comp
 liance
DESCRIPTION:North Carolina RECs / RPS (North Carolina PUC / RPS program)\n
 Type: Compliance\nStatus: Confirmed\nElectric power suppliers file the fo
 rward compliance plan (Rule R8-67(b)) and prior-year compliance report (R
 8-67(c)) by Sept 1\; retail-sales data entered into NC-RETS by June 1\; I
 OU target 12.5%\; expanded to CEPS by SL 2023-138\; RECs tracked in NC-RE
 TS.\nSource: https://www.ncuc.gov/Reps/reps.html
URL:https://www.ncuc.gov/Reps/reps.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2a96a653a4e3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230901
DTEND;VALUE=DATE:20230902
SUMMARY:[REC_PA] PA AEPS true-up period closes (Tier I/II + solar) — Comp
 liance
DESCRIPTION:Pennsylvania RECs / RPS (Pennsylvania PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nThree-month true-up from the May 31 repo
 rting-year close\; after this the PUC verifies compliance and assesses AC
 P/SACP.\nSource: https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
URL:https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d2e1e84fa9ee@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230901
DTEND;VALUE=DATE:20230902
SUMMARY:[TIER] Facility-specific benchmark applications due (upcoming year
 ) — Deadline
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Deadline\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-in
 novation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f3aef73bb706@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230928
DTEND;VALUE=DATE:20230929
SUMMARY:[REC_DE] DE RPS compliance report due (~120 days after May 31 clos
 e) — Compliance
DESCRIPTION:Delaware RECs / RPS (Delaware PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nStandard-offer RPS obligation sits with Delmarva
 \; transitional-contract RECs transfer to the standard offer by Aug 1 (90
 %) and Sep 1\; 26 Del. Admin. C. 3008.\nSource: https://depsc.delaware.go
 v/rps-and-green-power-product-compliance/
URL:https://depsc.delaware.gov/rps-and-green-power-product-compliance/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2bc1b555e26c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20230930
DTEND;VALUE=DATE:20231001
SUMMARY:[EU_ETS] Surrender allowances for the prior year's emissions — Co
 mpliance
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Compl
 iance\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/
 carbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bd23a16b0425@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20231001
DTEND;VALUE=DATE:20231002
SUMMARY:[REC_NJ] NJ RPS annual compliance report due to BPU (EY Jun 1-May 
 31) — Compliance
DESCRIPTION:New Jersey RECs / RPS (New Jersey PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual report demonstrating Class I\, Class 
 II and solar (SREC-II/SuSI) compliance for the prior Energy Year\; N.J.A.
 C. 14:8-2.2.\nSource: https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-
 19-15-8A.pdf
URL:https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-19-15-8A.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5a6b86931abe@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20231015
DTEND;VALUE=DATE:20231016
SUMMARY:[REC_CT] CT RPS annual compliance filing (Exhibit A) due to PURA 
 — Compliance
DESCRIPTION:Connecticut RECs / RPS (Connecticut PUC / RPS program)\nType: 
 Compliance\nStatus: Confirmed\nDue Oct 15 of the year following the compl
 iance year (docket YEAR-06-01)\; Class I/II/III RECs settle via NEPOOL GI
 S by June 15.\nSource: https://portal.ct.gov/-/media/pura/electric/el-add
 s/master-rps--instructions---final92225.pdf
URL:https://portal.ct.gov/-/media/pura/electric/el-adds/master-rps--instru
 ctions---final92225.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:08903a88b59e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20231031
DTEND;VALUE=DATE:20231101
SUMMARY:[AU_SAFEGUARD] NGER emissions and energy report due (prior financi
 al year) — Reporting
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Reporting\nStatus: Confirmed\nSource: https://www.dcceew.gov.au/
 climate-change/emissions-reporting/national-greenhouse-energy-reporting-s
 cheme/safeguard-mechanism
URL:https://www.dcceew.gov.au/climate-change/emissions-reporting/national-
 greenhouse-energy-reporting-scheme/safeguard-mechanism
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9a4bea2d7533@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20231101
DTEND;VALUE=DATE:20231102
SUMMARY:[CCA] Annual compliance obligation surrender (approx.) — Complian
 ce
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Compliance\nStatus: Te
 ntative\nAnnual partial-surrender window\; full true-up at the close of e
 ach compliance period.\nSource: https://ww2.arb.ca.gov/our-work/programs/
 cap-and-trade-program
URL:https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-program
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b51782511289@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20231101
DTEND;VALUE=DATE:20231102
SUMMARY:[NG_ACER_GAS] EU gas storage 90% filling target (reference date) 
 — Compliance
DESCRIPTION:ACER Gas (ACER)\nType: Compliance\nStatus: Confirmed\nUnder Re
 gulation (EU) 2025/1733 the 90% storage target may be met any time betwee
 n 1 October and 1 December (replacing the former hard 1 November deadline
 )\, with limited deviations allowed\; in force through 2027. 1 November s
 hown as the reference benchmark.\nSource: https://energy.ec.europa.eu/top
 ics/energy-security/gas-storage_en
URL:https://energy.ec.europa.eu/topics/energy-security/gas-storage_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:abe7b46deee2@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20231101
DTEND;VALUE=DATE:20231102
SUMMARY:[WCA] Annual compliance deadline (30% of prior-year emissions\, 5 
 p.m. PT) — Compliance
DESCRIPTION:Washington Cap-and-Invest (Washington Department of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nRemaining obligation due at the clos
 e of each four-year compliance period.\nSource: https://ecology.wa.gov/ai
 r-climate/climate-commitment-act/cap-and-invest/auctions-and-market/compl
 iance
URL:https://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-inve
 st/auctions-and-market/compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c7f035faa310@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20231130
DTEND;VALUE=DATE:20231201
SUMMARY:[RINS] EPA statutory deadline to set the following year's RVO volu
 mes — Milestone
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Milestone\nStatus:
  Tentative\nEPA frequently misses this statutory date\; treat as a target
 \, not a fixed event.\nSource: https://www.congress.gov/crs-product/R43325
URL:https://www.congress.gov/crs-product/R43325
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:650d7289b0a9@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20231215
DTEND;VALUE=DATE:20231216
SUMMARY:[CA_OBPS] Regular-rate compensation deadline (excess emissions) —
  Compliance
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Compliance\nStatus: Confirmed\nIncreased-rate deadline follows in mi
 d-February\; CAD 110/t excess-emissions charge for 2026.\nSource: https:/
 /icapcarbonaction.com/en/ets/canada-federal-output-based-pricing-system
URL:https://icapcarbonaction.com/en/ets/canada-federal-output-based-pricin
 g-system
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:77fda16b3ba9@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240225
DTEND;VALUE=DATE:20240226
SUMMARY:[NESO] GB Capacity Market T-4 and T-1 auctions — Auction
DESCRIPTION:National Energy System Operator (Great Britain) (NESO)\nType: 
 Auction\nStatus: Tentative\nAnnual four-year-ahead (T-4) and one-year-ahe
 ad (T-1) capacity auctions\, typically held late February to early March\
 ; exact dates and parameters are set each cycle by DESNZ and NESO.\nSourc
 e: https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
URL:https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:52ecbdf1ab33@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240228
DTEND;VALUE=DATE:20240229
SUMMARY:[EU_ETS] Free allocation entered in the Union Registry (approx.) 
 — Allocation
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Alloc
 ation\nStatus: Tentative\nTypically end of February\; confirm against the
  annual allocation timetable.\nSource: https://icapcarbonaction.com/en/et
 s/eu-emissions-trading-system-eu-ets
URL:https://icapcarbonaction.com/en/ets/eu-emissions-trading-system-eu-ets
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:936406133f37@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240315
DTEND;VALUE=DATE:20240316
SUMMARY:[TIER] Forecasting report update due (prior data year) — Reportin
 g
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-i
 nnovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:43f69d5b4c33@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240326
DTEND;VALUE=DATE:20240327
SUMMARY:[MISO] Planning Resource Auction - offer window (last four busines
 s days of March) — Auction
DESCRIPTION:Midcontinent Independent System Operator (MISO)\nType: Auction
 \nStatus: Tentative\nMISO accepts PRA offers in the last four business da
 ys of March and posts results in late April (April 28 in 2026). Seasonal 
 accreditation applies\; exact days vary.\nSource: https://www.misoenergy.
 org/planning/resource-adequacy2/resource-adequacy/
URL:https://www.misoenergy.org/planning/resource-adequacy2/resource-adequa
 cy/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c4332f2a25f9@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[AU_SAFEGUARD] Safeguard compliance deadline (surrender ACCUs / SM
 Cs for excess) — Compliance
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Compliance\nStatus: Confirmed\nNet emissions must be at or below
  baseline\; compliance assessed as of 1 April.\nSource: https://cer.gov.a
 u/about-us/our-compliance-approach/compliance-and-enforcement-priorities/
 compliance-and-enforcement-priorities-2025-26
URL:https://cer.gov.au/about-us/our-compliance-approach/compliance-and-enf
 orcement-priorities/compliance-and-enforcement-priorities-2025-26
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:8160b162bd97@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[BC_LCFS] Annual compliance report due (prior compliance year) — 
 Compliance
DESCRIPTION:BC Low Carbon Fuels (BC Ministry of Energy and Climate Solutio
 ns)\nType: Compliance\nStatus: Confirmed\nCompliance period aligns with t
 he calendar year\; reports due on or before March 31.\nSource: https://ww
 w2.gov.bc.ca/gov/content/industry/electricity-alternative-energy/transpor
 tation-energies/renewable-low-carbon-fuels/requirements
URL:https://www2.gov.bc.ca/gov/content/industry/electricity-alternative-en
 ergy/transportation-energies/renewable-low-carbon-fuels/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:12d11d5d5cda@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[EU_ETS] Report verified emissions for the prior year (Union Regis
 try) — Reporting
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Repor
 ting\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/c
 arbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:032c8dd9b595@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[LCFS] Annual compliance / fuel pathway report due (prior data yea
 r) — Reporting
DESCRIPTION:Low Carbon Fuel Standard (CARB)\nType: Reporting\nStatus: Conf
 irmed\nSource: https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-s
 tandard/lcfs-registration-and-reporting
URL:https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-standard/lcfs
 -registration-and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5857462a2439@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[REC_HI] HI RPS annual status report to PUC (Docket 2007-0008) — 
 Reporting
DESCRIPTION:Hawaii RECs / RPS (Hawaii PUC / RPS program)\nType: Reporting\
 nStatus: Tentative\nHECO companies and KIUC file annual RPS status report
 s with the PUC under HRS 269-95\; 100% by 2045 on a net-generation basis 
 (Act 140\, 2022). Islanded grids - no external REC trading market. Exact 
 statutory filing date varies\; approximate marker.\nSource: https://puc.h
 awaii.gov/reports/energy-reports/renewable-portfolio-standards-rps-annual
 -reports/
URL:https://puc.hawaii.gov/reports/energy-reports/renewable-portfolio-stan
 dards-rps-annual-reports/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a0e240f24da0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[REC_ME] ME PUC annual RPS report (CEP compliance reports feed in)
  — Reporting
DESCRIPTION:Maine RECs / RPS (Maine PUC / RPS program)\nType: Reporting\nS
 tatus: Tentative\nMaine PUC publishes its annual RPS report to the Legisl
 ature ~Mar 31 (35-A M.R.S. 3210)\; competitive electricity providers self
 -report and settle RECs via NEPOOL GIS. Exact CEP filing date set by PUC 
 instructions.\nSource: https://www.maine.gov/mpuc/regulated-utilities/ele
 ctricity/renewable-programs/rps
URL:https://www.maine.gov/mpuc/regulated-utilities/electricity/renewable-p
 rograms/rps
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5e9056f9f2cf@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[REC_NY] NY Clean Energy Standard annual reconciliation (Tier 1/Ti
 er 4/ZEC) — True-up
DESCRIPTION:New York RECs / RPS (New York PUC / RPS program)\nType: True-u
 p\nStatus: Tentative\nPay-as-you-go: LSEs remit monthly obligation paymen
 ts to NYSERDA within 15 days of invoice\; after the Jan 1-Dec 31 complian
 ce year NYSERDA reconciles against final NYISO load. Annual reconciliatio
 n date varies\; ZEC runs on a fiscal-year basis. Tracked in NYGATS.\nSour
 ce: https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obl
 igations/Compliance
URL:https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obli
 gations/Compliance
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d98a12fdf870@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[UK_ETS] Verified annual emissions report due — Reporting
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.gov.uk/government/publi
 cations/participating-in-the-uk-ets/participating-in-the-uk-ets
URL:https://www.gov.uk/government/publications/participating-in-the-uk-ets
 /participating-in-the-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7c8f2aab7053@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240331
DTEND;VALUE=DATE:20240401
SUMMARY:[WA_CFS] Q4 quarterly report due (prior year) — Reporting
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Reporting\nStatus: Confirmed\nQuarterly reports are due about 90 da
 ys after each quarter-end\; March 31 is the Q4 deadline.\nSource: https:/
 /ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/clean-fuel-
 standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fed03034aa0d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240401
DTEND;VALUE=DATE:20240402
SUMMARY:[REC_DC] DC RPS supplier compliance report due to DCPSC (prior cal
 endar year) — Compliance
DESCRIPTION:Washington DC RECs / RPS (Washington DC PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nDue by April 1 of the year following t
 he compliance year\; high-value solar carve-out (DC SRECs)\; DCMR Title 1
 5\, Ch. 29.\nSource: https://dcpsc.org/getattachment/Orders-and-Regulatio
 ns/Orders-Rules-and-Regulations/District-of-Columbia-Municipal-Regulation
 s-Title-1/15-29-Compiled-(Updated-April-2022).pdf.aspx?lang=en-US
URL:https://dcpsc.org/getattachment/Orders-and-Regulations/Orders-Rules-an
 d-Regulations/District-of-Columbia-Municipal-Regulations-Title-1/15-29-Co
 mpiled-(Updated-April-2022).pdf.aspx?lang=en-US
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f100d8cbc893@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240401
DTEND;VALUE=DATE:20240402
SUMMARY:[REC_MD] MD RPS supplier compliance report due to PSC (prior calen
 dar year) — Compliance
DESCRIPTION:Maryland RECs / RPS (Maryland PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nOn or before April 1 each supplier files its RPS
  report and retires Tier 1/Tier 1 solar/Tier 2 RECs\; COMAR 20.61.04.02.\
 nSource: https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-
 02
URL:https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-02
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6049d157f168@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240415
DTEND;VALUE=DATE:20240416
SUMMARY:[REC_MO] MO RES annual compliance report due to PSC (prior calenda
 r year) — Compliance
DESCRIPTION:Missouri RECs / RPS (Missouri PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nInvestor-owned utilities (Ameren Missouri\, Ever
 gy\, Empire) file annual RES compliance reports and forward compliance pl
 ans under 20 CSR 4240-20.100\; 15% by 2021 with a 2% solar carve-out and 
 a 1% rate-impact cap\; RECs tracked in MRETS.\nSource: https://psc.mo.gov
 /electric/Renewable_Energy_Standard_Compliance_Reports
URL:https://psc.mo.gov/electric/Renewable_Energy_Standard_Compliance_Repor
 ts
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9bca5dc5c4c6@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240415
DTEND;VALUE=DATE:20240416
SUMMARY:[REC_OH] OH renewable portfolio annual status report due to PUCO (
 prior year) — Compliance
DESCRIPTION:Ohio RECs / RPS (Ohio PUC / RPS program)\nType: Compliance\nSt
 atus: Confirmed\nEDUs and CRES providers file by April 15\; standard caps
  at 8.5% by 2026\; OAC 4901:1-40-05.\nSource: https://puco.ohio.gov/utili
 ties/electricity/resources/ohio-renewable-energy-portfolio-standard/rps-f
 iling-faqs
URL:https://puco.ohio.gov/utilities/electricity/resources/ohio-renewable-e
 nergy-portfolio-standard/rps-filing-faqs
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f4fb61ec9cee@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240415
DTEND;VALUE=DATE:20240416
SUMMARY:[REC_WI] WI RPS annual compliance demonstration due to PSCW (prior
  calendar year) — Compliance
DESCRIPTION:Wisconsin RECs / RPS (Wisconsin PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nElectric providers demonstrate compliance by A
 pril 15 by retiring RECs/RRCs in M-RETS\; Wis. Stat. 196.378. Statewide 1
 0% goal (2015) met\; provider-specific baseline+6% requirements continue 
 indefinitely.\nSource: https://psc.wi.gov/Pages/ServiceType/Energy/Renewa
 bles/RpsCompliance.aspx
URL:https://psc.wi.gov/Pages/ServiceType/Energy/Renewables/RpsCompliance.a
 spx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:24ecb2cdcff1@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240418
DTEND;VALUE=DATE:20240419
SUMMARY:[NG_FERC] FERC Form 2 / 2-A annual report due (interstate gas pipe
 lines) — Reporting
DESCRIPTION:FERC Natural Gas (FERC)\nType: Reporting\nStatus: Confirmed\nA
 nnual financial and operational report for major / non-major interstate n
 atural gas pipelines\; due April 18 of the following year under 18 CFR 26
 0.1-260.2.\nSource: https://www.ferc.gov/industries-data/natural-gas/indu
 stry-forms
URL:https://www.ferc.gov/industries-data/natural-gas/industry-forms
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:30577a17ec29@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240430
DTEND;VALUE=DATE:20240501
SUMMARY:[CFR] Annual Credit Creation Report due (CATS) — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nCC1 and CC3 credits are created on April 30 with this report\; CI-Pa
 thway Reports share this deadline.\nSource: https://data-donnees.az.ec.gc
 .ca/data/climate/products/clean-fuel-regulations-credit-market-reporting?
 lang=en
URL:https://data-donnees.az.ec.gc.ca/data/climate/products/clean-fuel-regu
 lations-credit-market-reporting?lang=en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5e9187677e54@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240430
DTEND;VALUE=DATE:20240501
SUMMARY:[OR_CFP] Annual compliance report due (balance credits and deficit
 s) — Compliance
DESCRIPTION:Oregon Clean Fuels Program (Oregon DEQ)\nType: Compliance\nSta
 tus: Tentative\nLCFS-family April 30 standard\; confirm on Oregon DEQ's C
 FP calendar. Quarterly progress reports are due about 90 days after each 
 quarter-end.\nSource: https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overv
 iew.aspx
URL:https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overview.aspx
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:63a9449140a1@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240430
DTEND;VALUE=DATE:20240501
SUMMARY:[UK_ETS] Surrender allowances for the prior scheme year — Complia
 nce
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Compliance\nStatus: Confirmed\nA double-surrender easing applies for the 
 2026-2027 maritime years (both due 30 April 2028).\nSource: https://icapc
 arbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
URL:https://icapcarbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b1bc955167ab@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240430
DTEND;VALUE=DATE:20240501
SUMMARY:[WA_CFS] Annual compliance report due (prior compliance year) — C
 ompliance
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nSource: https://ecology.wa.gov/air-c
 limate/reducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bcd14f2274a0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240501
DTEND;VALUE=DATE:20240502
SUMMARY:[REC_MN] MN RES/Solar Standard REC retirement deadline (prior cale
 ndar year) — Compliance
DESCRIPTION:Minnesota RECs / RPS (Minnesota PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nRECs for the prior compliance year retired in 
 M-RETS by May 1\; annual verification report (RES\, Solar Energy Standard
 \, Green Pricing) filed with the PUC by June 1. 2023 law: 55% renewable b
 y 2035\, 100% carbon-free by 2040\; REC shelf life = generation year + 4.
 \nSource: https://mn.gov/commerce-stat/energy/industry-government/utiliti
 es/annual-reporting/notice_26-12_final_signed.pdf
URL:https://mn.gov/commerce-stat/energy/industry-government/utilities/annu
 al-reporting/notice_26-12_final_signed.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0cdd82927084@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240501
DTEND;VALUE=DATE:20240502
SUMMARY:[REC_VA] VA VCEA RPS annual development plan filed with SCC (Domin
 ion ~May 1) — Compliance
DESCRIPTION:Virginia RECs / RPS (Virginia PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nProceeding-based: Dominion (~May 1) and APCo (la
 te April) file annual RPS development plans (Va. Code 56-585.5(D))\; comp
 liance demonstrated by retiring RECs every year via PJM-GATS\; 100% by 20
 45 (Dominion) / 2050 (APCo)\; from 2025\, 75% of Dominion's RECs must be 
 Virginia-sited.\nSource: https://www.scc.virginia.gov/regulated-industrie
 s/utility-regulation/energy-regulation/renewable-resources/arbs/
URL:https://www.scc.virginia.gov/regulated-industries/utility-regulation/e
 nergy-regulation/renewable-resources/arbs/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f71560a93d3b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240602
SUMMARY:[CA_OBPS] Annual report and verification report due — Reporting
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Reporting\nStatus: Confirmed\nFederal OBPS now applies only in Manit
 oba\, PEI\, Yukon and Nunavut\; most large emitters sit under provincial 
 systems.\nSource: https://www.canada.ca/en/environment-climate-change/ser
 vices/climate-change/pricing-pollution-how-it-will-work/output-based-pric
 ing-system.html
URL:https://www.canada.ca/en/environment-climate-change/services/climate-c
 hange/pricing-pollution-how-it-will-work/output-based-pricing-system.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:71a6d7a1e7ff@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240602
SUMMARY:[QC_CAT] Annual verified GHG emissions report (SGE GES) — Reporti
 ng
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Reporti
 ng\nStatus: Tentative\nApproximate\; confirm the exact Quebec reporting d
 ate.\nSource: https://www.environnement.gouv.qc.ca/changementsclimatiques
 /marche-carbone_en.asp
URL:https://www.environnement.gouv.qc.ca/changementsclimatiques/marche-car
 bone_en.asp
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5e507d972f77@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240602
SUMMARY:[REC_CO] CO RES annual compliance report due to PUC (prior calenda
 r year) — Compliance
DESCRIPTION:Colorado RECs / RPS (Colorado PUC / RPS program)\nType: Compli
 ance\nStatus: Tentative\nQualifying retail utilities (Xcel/Public Service
 \, Black Hills) and wholesale utilities (Tri-State) file annual RES compl
 iance reports under PUC Rule 3662 (4 CCR 723-3) ~June 1\, plus forward co
 mpliance plans\; 30% by 2020 (IOUs)\; SB19-236 clean-energy 80% by 2030 /
  100% by 2050 goals\; WREGIS-tracked. Exact date approximate.\nSource: ht
 tps://puc.colorado.gov/utilityforms
URL:https://puc.colorado.gov/utilityforms
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c82cff417b46@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240602
SUMMARY:[REC_IL] IL RPS delivery year begins (Jun 1-May 31) - IPA-procured
  — Milestone
DESCRIPTION:Illinois RECs / RPS (Illinois PUC / RPS program)\nType: Milest
 one\nStatus: Confirmed\nIllinois RPS is procurement-based: the Illinois P
 ower Agency procures RECs for ComEd/Ameren/MidAmerican via its Long-Term 
 Plan (Illinois Shines/ABP). Per-supplier ARES REC obligations phased out 
 after the 2018-19 delivery year. Indexed-REC procurements run on calendar
  years\; other procurements on the delivery year.\nSource: https://ipa.il
 linois.gov/renewable-resources.html
URL:https://ipa.illinois.gov/renewable-resources.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:133c9ca0b67e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240602
SUMMARY:[REC_OR] OR RPS annual compliance report due to OPUC (prior calend
 ar year) — Compliance
DESCRIPTION:Oregon RECs / RPS (Oregon PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nIOUs and electricity service suppliers file by June 
 1 (ORS 469A)\; consumer-owned utilities report to their boards/members\; 
 RECs retired via WREGIS\; ACP option under a 4% cost cap\; large utilitie
 s 50% by 2040 (SB 1547). RPS Implementation Plan filed Jan 1 of even year
 s.\nSource: https://www.oregon.gov/energy/energy-oregon/pages/renewable-p
 ortfolio-standard.aspx
URL:https://www.oregon.gov/energy/energy-oregon/pages/renewable-portfolio-
 standard.aspx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f0f1b56e7916@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240602
SUMMARY:[REC_WA] WA Energy Independence Act annual report due to Commerce 
 (prior year) — Reporting
DESCRIPTION:Washington RECs / RPS (Washington PUC / RPS program)\nType: Re
 porting\nStatus: Confirmed\nQualifying utilities report annually by June 
 1 (RCW 19.285)\; the 15% renewable target was met (2020). CETA (RCW 19.40
 5) layers a 100%-clean-by-2045 obligation via 4-year Clean Energy Impleme
 ntation Plans and multi-year compliance periods (first CETA interim perfo
 rmance report due July 1\, 2026).\nSource: https://www.utc.wa.gov/regulat
 ed-industries/utilities/energy/conservation-and-renewable-energy-overview
 /washington-energy-independence-act-i-937
URL:https://www.utc.wa.gov/regulated-industries/utilities/energy/conservat
 ion-and-renewable-energy-overview/washington-energy-independence-act-i-937
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5bfed392156b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240602
SUMMARY:[RINS] RFS attest engagement report (RFS 0304T) due — Reporting
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Reporting\nStatus:
  Tentative\nGenerally June 1 following the compliance year\; the exact ye
 ar tracks the compliance-deadline timing.\nSource: https://www.epa.gov/re
 newable-fuel-standard/extension-renewable-fuel-standard-compliance-deadli
 nes-final-rulemaking
URL:https://www.epa.gov/renewable-fuel-standard/extension-renewable-fuel-s
 tandard-compliance-deadlines-final-rulemaking
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:83d599c83abb@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240601
DTEND;VALUE=DATE:20240602
SUMMARY:[WA_CFS] Credit Clearance Market window opens\, if required — Mil
 estone
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Milestone\nStatus: Tentative\nRuns June 1 to July 31\; held only if
  parties have unmet obligations (determined by May 15). Max price set by 
 the first Monday of April.\nSource: https://ecology.wa.gov/air-climate/re
 ducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:26d12c0a7f12@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240630
DTEND;VALUE=DATE:20240701
SUMMARY:[CFR] Credit-adjustment report due — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nSource: https://www.ccarbon.info/news/eccc-releases-detailed-factshe
 et-on-carbon-intensity-pathway-reports-for-clean-fuel-regulations/
URL:https://www.ccarbon.info/news/eccc-releases-detailed-factsheet-on-carb
 on-intensity-pathway-reports-for-clean-fuel-regulations/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9efc6817d881@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240630
DTEND;VALUE=DATE:20240701
SUMMARY:[REC_MI] MI renewable energy annual compliance report due to MPSC 
 (prior year) — Reporting
DESCRIPTION:Michigan RECs / RPS (Michigan PUC / RPS program)\nType: Report
 ing\nStatus: Confirmed\nElectric providers retire RECs in MIRECS at year-
 end and file annual compliance reports in their renewable-energy-plan doc
 kets by June 30\; PA 235 (2023): RPS 50% by 2030\, 60% by 2035\, Clean En
 ergy Standard 100% by 2040\; REP plans filed biennially.\nSource: https:/
 /www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
URL:https://www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:307fe84b692a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240630
DTEND;VALUE=DATE:20240701
SUMMARY:[TIER] Verified annual compliance report and true-up obligation du
 e — Compliance
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Compliance\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-
 innovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:13d25637ec10@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240701
DTEND;VALUE=DATE:20240702
SUMMARY:[CR_FERC_OIL] FERC oil pipeline index rate-ceiling adjustment take
 s effect — Effective date
DESCRIPTION:FERC Oil Pipeline Tariffs (FERC)\nType: Effective date\nStatus
 : Confirmed\nInterstate oil pipeline rate ceilings adjust each July 1 by 
 the FERC index (PPI-FG - 0.55% for the July 1\, 2026 - June 30\, 2031 ter
 m)\; FERC publishes the annual multiplier in May.\nSource: https://www.fe
 rc.gov/general-information-1/oil-pipeline-index
URL:https://www.ferc.gov/general-information-1/oil-pipeline-index
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:25d5e61603f2@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240701
DTEND;VALUE=DATE:20240702
SUMMARY:[REC_MA] MA RPS/APS annual compliance filing due to DOER (prior ca
 lendar year) — Compliance
DESCRIPTION:Massachusetts RECs / RPS (Massachusetts PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nCovers RPS Class I/II\, APS\, CES and 
 CPS\; due July 1 (or next business day)\; 225 CMR 14.09/15.09/16.09.\nSou
 rce: https://www.mass.gov/info-details/annual-compliance-reports-and-othe
 r-publications
URL:https://www.mass.gov/info-details/annual-compliance-reports-and-other-
 publications
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6ee50e9cfba3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240701
DTEND;VALUE=DATE:20240702
SUMMARY:[REC_NM] NM Renewable Energy Act procurement plan + portfolio repo
 rt due to PRC — Compliance
DESCRIPTION:New Mexico RECs / RPS (New Mexico PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual procurement plan and prior-year portf
 olio report filed on a staggered schedule (El Paso Electric May 1\, PNM J
 une 1\, SPS July 1) under Rule 572 / 62-16-4 NMSA\; ETA 2019: 50% by 2030
 \, 80% by 2040\, 100% carbon-free by 2045\; WREGIS\; RECs carry forward u
 p to 4 years.\nSource: https://www.prc.nm.gov/utilities/renewable-energy/
URL:https://www.prc.nm.gov/utilities/renewable-energy/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a6e4808c9415@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240701
DTEND;VALUE=DATE:20240702
SUMMARY:[REC_NV] NV RPS annual compliance report due to PUCN (prior calend
 ar year) — Compliance
DESCRIPTION:Nevada RECs / RPS (Nevada PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nProviders of electric service file by July 1 (NRS 70
 4.7825)\; 50% by 2030 / 100% carbon-free goal by 2050\; portfolio energy 
 credits (PECs)\; EE counts toward up to 10% (phasing out for 2025+).\nSou
 rce: https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
URL:https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:8e2577facf20@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240715
DTEND;VALUE=DATE:20240716
SUMMARY:[REC_NH] NH RPS annual compliance filing (Form E-2500) due to Dept
  of Energy — Compliance
DESCRIPTION:New Hampshire RECs / RPS (New Hampshire PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nFiled in the July 1-15 window (RSA 362
 -F:8 as amended by HB 2 sec. 112\, effective 2023)\; Classes I-IV\; NEPOO
 L GIS.\nSource: https://www.energy.nh.gov/renewable-energy/renewable-port
 folio-standard/renewable-portfolio-standard-compliance
URL:https://www.energy.nh.gov/renewable-energy/renewable-portfolio-standar
 d/renewable-portfolio-standard-compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:646c530c91b8@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240715
DTEND;VALUE=DATE:20240716
SUMMARY:[REC_RI] RI Renewable Energy Standard compliance filing due to PUC
  — Compliance
DESCRIPTION:Rhode Island RECs / RPS (Rhode Island PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nWithin 30 days after Q4 NEPOOL GIS repor
 ts (no later than July 15)\; ACP to the Renewable Energy Development Fund
 \; 810-RICR-40-05-2.\nSource: https://ripuc.ri.gov/utility-information/el
 ectric/rhode-island-renewable-energy-standard-ri-res-program
URL:https://ripuc.ri.gov/utility-information/electric/rhode-island-renewab
 le-energy-standard-ri-res-program
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:215737d942af@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240801
DTEND;VALUE=DATE:20240802
SUMMARY:[REC_CA_PCC1] CA RPS Annual Compliance Report due to CPUC - PCC1 (
 bundled) — Compliance
DESCRIPTION:California RPS PCC1 (bundled\, delivered) (CPUC / CEC)\nType: 
 Compliance\nStatus: Confirmed\nPCC1 = RPS-eligible generation interconnec
 ted to / scheduled into a CA balancing authority (bundled\, delivered). R
 etail sellers (IOUs/ESPs/CCAs) file the Annual RPS Compliance Report by A
 ug 1 (D.12-06-038)\; measured over 3-year compliance periods\; WREGIS-tra
 cked\; SB 100: 60% by 2030.\nSource: https://www.cpuc.ca.gov/industries-a
 nd-topics/electrical-energy/electric-power-procurement/rps/rps-compliance
 -rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:8767c440d918@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240801
DTEND;VALUE=DATE:20240802
SUMMARY:[REC_CA_PCC2] CA RPS Annual Compliance Report due to CPUC - PCC2 (
 firmed & shaped) — Compliance
DESCRIPTION:California RPS PCC2 (firmed & shaped) (CPUC / CEC)\nType: Comp
 liance\nStatus: Confirmed\nPCC2 = firmed-and-shaped / incremental electri
 city with substitute energy. Same Aug 1 CPUC Annual RPS Compliance Report
  (D.12-06-038)\; WREGIS-tracked.\nSource: https://www.cpuc.ca.gov/industr
 ies-and-topics/electrical-energy/electric-power-procurement/rps/rps-compl
 iance-rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4279f733a592@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240801
DTEND;VALUE=DATE:20240802
SUMMARY:[REC_CA_PCC3] CA RPS Annual Compliance Report due to CPUC - PCC3 (
 unbundled RECs) — Compliance
DESCRIPTION:California RPS PCC3 (unbundled / TRECs) (CPUC / CEC)\nType: Co
 mpliance\nStatus: Confirmed\nPCC3 = unbundled RECs (TRECs) and products n
 ot qualifying as PCC1/PCC2 - the tradable category\, subject to a procure
 ment cap and portfolio-balance limits. Same Aug 1 CPUC Annual RPS Complia
 nce Report (D.12-06-038).\nSource: https://www.cpuc.ca.gov/industries-and
 -topics/electrical-energy/electric-power-procurement/rps/rps-compliance-r
 ules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:470434241f1c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240831
DTEND;VALUE=DATE:20240901
SUMMARY:[REC_VT] VT Renewable Energy Standard annual compliance filing due
  to PUC — Compliance
DESCRIPTION:Vermont RECs / RPS (Vermont PUC / RPS program)\nType: Complian
 ce\nStatus: Confirmed\nDistribution utilities file by Aug 31 (PUC Docket 
 8550)\; Tiers I/II met by retiring NEPOOL GIS RECs\, plus Tier III energy
  transformation. No retail choice in VT.\nSource: https://publicservice.v
 ermont.gov/renewables/renewable-energy-standard
URL:https://publicservice.vermont.gov/renewables/renewable-energy-standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ec386449949a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240901
DTEND;VALUE=DATE:20240902
SUMMARY:[REC_NC] NC REPS/CEPS compliance plan + report due to NCUC — Comp
 liance
DESCRIPTION:North Carolina RECs / RPS (North Carolina PUC / RPS program)\n
 Type: Compliance\nStatus: Confirmed\nElectric power suppliers file the fo
 rward compliance plan (Rule R8-67(b)) and prior-year compliance report (R
 8-67(c)) by Sept 1\; retail-sales data entered into NC-RETS by June 1\; I
 OU target 12.5%\; expanded to CEPS by SL 2023-138\; RECs tracked in NC-RE
 TS.\nSource: https://www.ncuc.gov/Reps/reps.html
URL:https://www.ncuc.gov/Reps/reps.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:480a41aa481c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240901
DTEND;VALUE=DATE:20240902
SUMMARY:[REC_PA] PA AEPS true-up period closes (Tier I/II + solar) — Comp
 liance
DESCRIPTION:Pennsylvania RECs / RPS (Pennsylvania PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nThree-month true-up from the May 31 repo
 rting-year close\; after this the PUC verifies compliance and assesses AC
 P/SACP.\nSource: https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
URL:https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:089651125bbf@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240901
DTEND;VALUE=DATE:20240902
SUMMARY:[TIER] Facility-specific benchmark applications due (upcoming year
 ) — Deadline
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Deadline\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-in
 novation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1189a3815bb0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240928
DTEND;VALUE=DATE:20240929
SUMMARY:[REC_DE] DE RPS compliance report due (~120 days after May 31 clos
 e) — Compliance
DESCRIPTION:Delaware RECs / RPS (Delaware PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nStandard-offer RPS obligation sits with Delmarva
 \; transitional-contract RECs transfer to the standard offer by Aug 1 (90
 %) and Sep 1\; 26 Del. Admin. C. 3008.\nSource: https://depsc.delaware.go
 v/rps-and-green-power-product-compliance/
URL:https://depsc.delaware.gov/rps-and-green-power-product-compliance/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c0cae7d4e96a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20240930
DTEND;VALUE=DATE:20241001
SUMMARY:[EU_ETS] Surrender allowances for the prior year's emissions — Co
 mpliance
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Compl
 iance\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/
 carbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c1d80bdf84ac@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20241001
DTEND;VALUE=DATE:20241002
SUMMARY:[REC_NJ] NJ RPS annual compliance report due to BPU (EY Jun 1-May 
 31) — Compliance
DESCRIPTION:New Jersey RECs / RPS (New Jersey PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual report demonstrating Class I\, Class 
 II and solar (SREC-II/SuSI) compliance for the prior Energy Year\; N.J.A.
 C. 14:8-2.2.\nSource: https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-
 19-15-8A.pdf
URL:https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-19-15-8A.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e9984c299a08@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20241015
DTEND;VALUE=DATE:20241016
SUMMARY:[REC_CT] CT RPS annual compliance filing (Exhibit A) due to PURA 
 — Compliance
DESCRIPTION:Connecticut RECs / RPS (Connecticut PUC / RPS program)\nType: 
 Compliance\nStatus: Confirmed\nDue Oct 15 of the year following the compl
 iance year (docket YEAR-06-01)\; Class I/II/III RECs settle via NEPOOL GI
 S by June 15.\nSource: https://portal.ct.gov/-/media/pura/electric/el-add
 s/master-rps--instructions---final92225.pdf
URL:https://portal.ct.gov/-/media/pura/electric/el-adds/master-rps--instru
 ctions---final92225.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e9b951d14882@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20241031
DTEND;VALUE=DATE:20241101
SUMMARY:[AU_SAFEGUARD] NGER emissions and energy report due (prior financi
 al year) — Reporting
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Reporting\nStatus: Confirmed\nSource: https://www.dcceew.gov.au/
 climate-change/emissions-reporting/national-greenhouse-energy-reporting-s
 cheme/safeguard-mechanism
URL:https://www.dcceew.gov.au/climate-change/emissions-reporting/national-
 greenhouse-energy-reporting-scheme/safeguard-mechanism
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5055663404ad@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20241101
DTEND;VALUE=DATE:20241102
SUMMARY:[CCA] Annual compliance obligation surrender (approx.) — Complian
 ce
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Compliance\nStatus: Te
 ntative\nAnnual partial-surrender window\; full true-up at the close of e
 ach compliance period.\nSource: https://ww2.arb.ca.gov/our-work/programs/
 cap-and-trade-program
URL:https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-program
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:34c8ba5fe58b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20241101
DTEND;VALUE=DATE:20241102
SUMMARY:[NG_ACER_GAS] EU gas storage 90% filling target (reference date) 
 — Compliance
DESCRIPTION:ACER Gas (ACER)\nType: Compliance\nStatus: Confirmed\nUnder Re
 gulation (EU) 2025/1733 the 90% storage target may be met any time betwee
 n 1 October and 1 December (replacing the former hard 1 November deadline
 )\, with limited deviations allowed\; in force through 2027. 1 November s
 hown as the reference benchmark.\nSource: https://energy.ec.europa.eu/top
 ics/energy-security/gas-storage_en
URL:https://energy.ec.europa.eu/topics/energy-security/gas-storage_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4ccf52c84d81@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20241101
DTEND;VALUE=DATE:20241102
SUMMARY:[WCA] Annual compliance deadline (30% of prior-year emissions\, 5 
 p.m. PT) — Compliance
DESCRIPTION:Washington Cap-and-Invest (Washington Department of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nRemaining obligation due at the clos
 e of each four-year compliance period.\nSource: https://ecology.wa.gov/ai
 r-climate/climate-commitment-act/cap-and-invest/auctions-and-market/compl
 iance
URL:https://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-inve
 st/auctions-and-market/compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4c717bea5c26@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20241130
DTEND;VALUE=DATE:20241201
SUMMARY:[RINS] EPA statutory deadline to set the following year's RVO volu
 mes — Milestone
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Milestone\nStatus:
  Tentative\nEPA frequently misses this statutory date\; treat as a target
 \, not a fixed event.\nSource: https://www.congress.gov/crs-product/R43325
URL:https://www.congress.gov/crs-product/R43325
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:80301a7fed53@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20241215
DTEND;VALUE=DATE:20241216
SUMMARY:[CA_OBPS] Regular-rate compensation deadline (excess emissions) —
  Compliance
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Compliance\nStatus: Confirmed\nIncreased-rate deadline follows in mi
 d-February\; CAD 110/t excess-emissions charge for 2026.\nSource: https:/
 /icapcarbonaction.com/en/ets/canada-federal-output-based-pricing-system
URL:https://icapcarbonaction.com/en/ets/canada-federal-output-based-pricin
 g-system
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3a52b5cb1068@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250225
DTEND;VALUE=DATE:20250226
SUMMARY:[NESO] GB Capacity Market T-4 and T-1 auctions — Auction
DESCRIPTION:National Energy System Operator (Great Britain) (NESO)\nType: 
 Auction\nStatus: Tentative\nAnnual four-year-ahead (T-4) and one-year-ahe
 ad (T-1) capacity auctions\, typically held late February to early March\
 ; exact dates and parameters are set each cycle by DESNZ and NESO.\nSourc
 e: https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
URL:https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3120d52cc1a3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250228
DTEND;VALUE=DATE:20250301
SUMMARY:[EU_ETS] Free allocation entered in the Union Registry (approx.) 
 — Allocation
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Alloc
 ation\nStatus: Tentative\nTypically end of February\; confirm against the
  annual allocation timetable.\nSource: https://icapcarbonaction.com/en/et
 s/eu-emissions-trading-system-eu-ets
URL:https://icapcarbonaction.com/en/ets/eu-emissions-trading-system-eu-ets
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e9e3667b4db2@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250315
DTEND;VALUE=DATE:20250316
SUMMARY:[TIER] Forecasting report update due (prior data year) — Reportin
 g
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-i
 nnovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5b5cfa648c9e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250326
DTEND;VALUE=DATE:20250327
SUMMARY:[MISO] Planning Resource Auction - offer window (last four busines
 s days of March) — Auction
DESCRIPTION:Midcontinent Independent System Operator (MISO)\nType: Auction
 \nStatus: Tentative\nMISO accepts PRA offers in the last four business da
 ys of March and posts results in late April (April 28 in 2026). Seasonal 
 accreditation applies\; exact days vary.\nSource: https://www.misoenergy.
 org/planning/resource-adequacy2/resource-adequacy/
URL:https://www.misoenergy.org/planning/resource-adequacy2/resource-adequa
 cy/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f4141239070d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[AU_SAFEGUARD] Safeguard compliance deadline (surrender ACCUs / SM
 Cs for excess) — Compliance
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Compliance\nStatus: Confirmed\nNet emissions must be at or below
  baseline\; compliance assessed as of 1 April.\nSource: https://cer.gov.a
 u/about-us/our-compliance-approach/compliance-and-enforcement-priorities/
 compliance-and-enforcement-priorities-2025-26
URL:https://cer.gov.au/about-us/our-compliance-approach/compliance-and-enf
 orcement-priorities/compliance-and-enforcement-priorities-2025-26
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:077581a14921@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[BC_LCFS] Annual compliance report due (prior compliance year) — 
 Compliance
DESCRIPTION:BC Low Carbon Fuels (BC Ministry of Energy and Climate Solutio
 ns)\nType: Compliance\nStatus: Confirmed\nCompliance period aligns with t
 he calendar year\; reports due on or before March 31.\nSource: https://ww
 w2.gov.bc.ca/gov/content/industry/electricity-alternative-energy/transpor
 tation-energies/renewable-low-carbon-fuels/requirements
URL:https://www2.gov.bc.ca/gov/content/industry/electricity-alternative-en
 ergy/transportation-energies/renewable-low-carbon-fuels/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:89b5d60accc5@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[EU_ETS] Report verified emissions for the prior year (Union Regis
 try) — Reporting
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Repor
 ting\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/c
 arbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:115fe23a1777@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[LCFS] Annual compliance / fuel pathway report due (prior data yea
 r) — Reporting
DESCRIPTION:Low Carbon Fuel Standard (CARB)\nType: Reporting\nStatus: Conf
 irmed\nSource: https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-s
 tandard/lcfs-registration-and-reporting
URL:https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-standard/lcfs
 -registration-and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:97ba7c5b6e87@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[REC_HI] HI RPS annual status report to PUC (Docket 2007-0008) — 
 Reporting
DESCRIPTION:Hawaii RECs / RPS (Hawaii PUC / RPS program)\nType: Reporting\
 nStatus: Tentative\nHECO companies and KIUC file annual RPS status report
 s with the PUC under HRS 269-95\; 100% by 2045 on a net-generation basis 
 (Act 140\, 2022). Islanded grids - no external REC trading market. Exact 
 statutory filing date varies\; approximate marker.\nSource: https://puc.h
 awaii.gov/reports/energy-reports/renewable-portfolio-standards-rps-annual
 -reports/
URL:https://puc.hawaii.gov/reports/energy-reports/renewable-portfolio-stan
 dards-rps-annual-reports/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e4680e4dc45a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[REC_ME] ME PUC annual RPS report (CEP compliance reports feed in)
  — Reporting
DESCRIPTION:Maine RECs / RPS (Maine PUC / RPS program)\nType: Reporting\nS
 tatus: Tentative\nMaine PUC publishes its annual RPS report to the Legisl
 ature ~Mar 31 (35-A M.R.S. 3210)\; competitive electricity providers self
 -report and settle RECs via NEPOOL GIS. Exact CEP filing date set by PUC 
 instructions.\nSource: https://www.maine.gov/mpuc/regulated-utilities/ele
 ctricity/renewable-programs/rps
URL:https://www.maine.gov/mpuc/regulated-utilities/electricity/renewable-p
 rograms/rps
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:42ce6cb38992@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[REC_NY] NY Clean Energy Standard annual reconciliation (Tier 1/Ti
 er 4/ZEC) — True-up
DESCRIPTION:New York RECs / RPS (New York PUC / RPS program)\nType: True-u
 p\nStatus: Tentative\nPay-as-you-go: LSEs remit monthly obligation paymen
 ts to NYSERDA within 15 days of invoice\; after the Jan 1-Dec 31 complian
 ce year NYSERDA reconciles against final NYISO load. Annual reconciliatio
 n date varies\; ZEC runs on a fiscal-year basis. Tracked in NYGATS.\nSour
 ce: https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obl
 igations/Compliance
URL:https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obli
 gations/Compliance
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7bd527f8a693@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[UK_ETS] Verified annual emissions report due — Reporting
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.gov.uk/government/publi
 cations/participating-in-the-uk-ets/participating-in-the-uk-ets
URL:https://www.gov.uk/government/publications/participating-in-the-uk-ets
 /participating-in-the-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b3323d4bea23@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250331
DTEND;VALUE=DATE:20250401
SUMMARY:[WA_CFS] Q4 quarterly report due (prior year) — Reporting
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Reporting\nStatus: Confirmed\nQuarterly reports are due about 90 da
 ys after each quarter-end\; March 31 is the Q4 deadline.\nSource: https:/
 /ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/clean-fuel-
 standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:51d67c865de6@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250401
DTEND;VALUE=DATE:20250402
SUMMARY:[REC_DC] DC RPS supplier compliance report due to DCPSC (prior cal
 endar year) — Compliance
DESCRIPTION:Washington DC RECs / RPS (Washington DC PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nDue by April 1 of the year following t
 he compliance year\; high-value solar carve-out (DC SRECs)\; DCMR Title 1
 5\, Ch. 29.\nSource: https://dcpsc.org/getattachment/Orders-and-Regulatio
 ns/Orders-Rules-and-Regulations/District-of-Columbia-Municipal-Regulation
 s-Title-1/15-29-Compiled-(Updated-April-2022).pdf.aspx?lang=en-US
URL:https://dcpsc.org/getattachment/Orders-and-Regulations/Orders-Rules-an
 d-Regulations/District-of-Columbia-Municipal-Regulations-Title-1/15-29-Co
 mpiled-(Updated-April-2022).pdf.aspx?lang=en-US
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9ae1af95bf0c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250401
DTEND;VALUE=DATE:20250402
SUMMARY:[REC_MD] MD RPS supplier compliance report due to PSC (prior calen
 dar year) — Compliance
DESCRIPTION:Maryland RECs / RPS (Maryland PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nOn or before April 1 each supplier files its RPS
  report and retires Tier 1/Tier 1 solar/Tier 2 RECs\; COMAR 20.61.04.02.\
 nSource: https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-
 02
URL:https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-02
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c31f9972e733@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250415
DTEND;VALUE=DATE:20250416
SUMMARY:[REC_MO] MO RES annual compliance report due to PSC (prior calenda
 r year) — Compliance
DESCRIPTION:Missouri RECs / RPS (Missouri PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nInvestor-owned utilities (Ameren Missouri\, Ever
 gy\, Empire) file annual RES compliance reports and forward compliance pl
 ans under 20 CSR 4240-20.100\; 15% by 2021 with a 2% solar carve-out and 
 a 1% rate-impact cap\; RECs tracked in MRETS.\nSource: https://psc.mo.gov
 /electric/Renewable_Energy_Standard_Compliance_Reports
URL:https://psc.mo.gov/electric/Renewable_Energy_Standard_Compliance_Repor
 ts
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:51049096c617@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250415
DTEND;VALUE=DATE:20250416
SUMMARY:[REC_OH] OH renewable portfolio annual status report due to PUCO (
 prior year) — Compliance
DESCRIPTION:Ohio RECs / RPS (Ohio PUC / RPS program)\nType: Compliance\nSt
 atus: Confirmed\nEDUs and CRES providers file by April 15\; standard caps
  at 8.5% by 2026\; OAC 4901:1-40-05.\nSource: https://puco.ohio.gov/utili
 ties/electricity/resources/ohio-renewable-energy-portfolio-standard/rps-f
 iling-faqs
URL:https://puco.ohio.gov/utilities/electricity/resources/ohio-renewable-e
 nergy-portfolio-standard/rps-filing-faqs
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ba922c052f2b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250415
DTEND;VALUE=DATE:20250416
SUMMARY:[REC_WI] WI RPS annual compliance demonstration due to PSCW (prior
  calendar year) — Compliance
DESCRIPTION:Wisconsin RECs / RPS (Wisconsin PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nElectric providers demonstrate compliance by A
 pril 15 by retiring RECs/RRCs in M-RETS\; Wis. Stat. 196.378. Statewide 1
 0% goal (2015) met\; provider-specific baseline+6% requirements continue 
 indefinitely.\nSource: https://psc.wi.gov/Pages/ServiceType/Energy/Renewa
 bles/RpsCompliance.aspx
URL:https://psc.wi.gov/Pages/ServiceType/Energy/Renewables/RpsCompliance.a
 spx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:de9912c52ecb@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250418
DTEND;VALUE=DATE:20250419
SUMMARY:[NG_FERC] FERC Form 2 / 2-A annual report due (interstate gas pipe
 lines) — Reporting
DESCRIPTION:FERC Natural Gas (FERC)\nType: Reporting\nStatus: Confirmed\nA
 nnual financial and operational report for major / non-major interstate n
 atural gas pipelines\; due April 18 of the following year under 18 CFR 26
 0.1-260.2.\nSource: https://www.ferc.gov/industries-data/natural-gas/indu
 stry-forms
URL:https://www.ferc.gov/industries-data/natural-gas/industry-forms
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2f5195d152c8@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250430
DTEND;VALUE=DATE:20250501
SUMMARY:[CFR] Annual Credit Creation Report due (CATS) — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nCC1 and CC3 credits are created on April 30 with this report\; CI-Pa
 thway Reports share this deadline.\nSource: https://data-donnees.az.ec.gc
 .ca/data/climate/products/clean-fuel-regulations-credit-market-reporting?
 lang=en
URL:https://data-donnees.az.ec.gc.ca/data/climate/products/clean-fuel-regu
 lations-credit-market-reporting?lang=en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9bdc64c5231e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250430
DTEND;VALUE=DATE:20250501
SUMMARY:[OR_CFP] Annual compliance report due (balance credits and deficit
 s) — Compliance
DESCRIPTION:Oregon Clean Fuels Program (Oregon DEQ)\nType: Compliance\nSta
 tus: Tentative\nLCFS-family April 30 standard\; confirm on Oregon DEQ's C
 FP calendar. Quarterly progress reports are due about 90 days after each 
 quarter-end.\nSource: https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overv
 iew.aspx
URL:https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overview.aspx
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:24d26d12d889@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250430
DTEND;VALUE=DATE:20250501
SUMMARY:[UK_ETS] Surrender allowances for the prior scheme year — Complia
 nce
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Compliance\nStatus: Confirmed\nA double-surrender easing applies for the 
 2026-2027 maritime years (both due 30 April 2028).\nSource: https://icapc
 arbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
URL:https://icapcarbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:acc0ed796108@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250430
DTEND;VALUE=DATE:20250501
SUMMARY:[WA_CFS] Annual compliance report due (prior compliance year) — C
 ompliance
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nSource: https://ecology.wa.gov/air-c
 limate/reducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6b1b87237332@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250501
DTEND;VALUE=DATE:20250502
SUMMARY:[REC_MN] MN RES/Solar Standard REC retirement deadline (prior cale
 ndar year) — Compliance
DESCRIPTION:Minnesota RECs / RPS (Minnesota PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nRECs for the prior compliance year retired in 
 M-RETS by May 1\; annual verification report (RES\, Solar Energy Standard
 \, Green Pricing) filed with the PUC by June 1. 2023 law: 55% renewable b
 y 2035\, 100% carbon-free by 2040\; REC shelf life = generation year + 4.
 \nSource: https://mn.gov/commerce-stat/energy/industry-government/utiliti
 es/annual-reporting/notice_26-12_final_signed.pdf
URL:https://mn.gov/commerce-stat/energy/industry-government/utilities/annu
 al-reporting/notice_26-12_final_signed.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:763aefa8e64c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250501
DTEND;VALUE=DATE:20250502
SUMMARY:[REC_VA] VA VCEA RPS annual development plan filed with SCC (Domin
 ion ~May 1) — Compliance
DESCRIPTION:Virginia RECs / RPS (Virginia PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nProceeding-based: Dominion (~May 1) and APCo (la
 te April) file annual RPS development plans (Va. Code 56-585.5(D))\; comp
 liance demonstrated by retiring RECs every year via PJM-GATS\; 100% by 20
 45 (Dominion) / 2050 (APCo)\; from 2025\, 75% of Dominion's RECs must be 
 Virginia-sited.\nSource: https://www.scc.virginia.gov/regulated-industrie
 s/utility-regulation/energy-regulation/renewable-resources/arbs/
URL:https://www.scc.virginia.gov/regulated-industries/utility-regulation/e
 nergy-regulation/renewable-resources/arbs/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:070978d2ff7d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250601
DTEND;VALUE=DATE:20250602
SUMMARY:[CA_OBPS] Annual report and verification report due — Reporting
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Reporting\nStatus: Confirmed\nFederal OBPS now applies only in Manit
 oba\, PEI\, Yukon and Nunavut\; most large emitters sit under provincial 
 systems.\nSource: https://www.canada.ca/en/environment-climate-change/ser
 vices/climate-change/pricing-pollution-how-it-will-work/output-based-pric
 ing-system.html
URL:https://www.canada.ca/en/environment-climate-change/services/climate-c
 hange/pricing-pollution-how-it-will-work/output-based-pricing-system.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:248dca3a0ff3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250601
DTEND;VALUE=DATE:20250602
SUMMARY:[QC_CAT] Annual verified GHG emissions report (SGE GES) — Reporti
 ng
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Reporti
 ng\nStatus: Tentative\nApproximate\; confirm the exact Quebec reporting d
 ate.\nSource: https://www.environnement.gouv.qc.ca/changementsclimatiques
 /marche-carbone_en.asp
URL:https://www.environnement.gouv.qc.ca/changementsclimatiques/marche-car
 bone_en.asp
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9b571646138f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250601
DTEND;VALUE=DATE:20250602
SUMMARY:[REC_CO] CO RES annual compliance report due to PUC (prior calenda
 r year) — Compliance
DESCRIPTION:Colorado RECs / RPS (Colorado PUC / RPS program)\nType: Compli
 ance\nStatus: Tentative\nQualifying retail utilities (Xcel/Public Service
 \, Black Hills) and wholesale utilities (Tri-State) file annual RES compl
 iance reports under PUC Rule 3662 (4 CCR 723-3) ~June 1\, plus forward co
 mpliance plans\; 30% by 2020 (IOUs)\; SB19-236 clean-energy 80% by 2030 /
  100% by 2050 goals\; WREGIS-tracked. Exact date approximate.\nSource: ht
 tps://puc.colorado.gov/utilityforms
URL:https://puc.colorado.gov/utilityforms
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:54b458ae053c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250601
DTEND;VALUE=DATE:20250602
SUMMARY:[REC_IL] IL RPS delivery year begins (Jun 1-May 31) - IPA-procured
  — Milestone
DESCRIPTION:Illinois RECs / RPS (Illinois PUC / RPS program)\nType: Milest
 one\nStatus: Confirmed\nIllinois RPS is procurement-based: the Illinois P
 ower Agency procures RECs for ComEd/Ameren/MidAmerican via its Long-Term 
 Plan (Illinois Shines/ABP). Per-supplier ARES REC obligations phased out 
 after the 2018-19 delivery year. Indexed-REC procurements run on calendar
  years\; other procurements on the delivery year.\nSource: https://ipa.il
 linois.gov/renewable-resources.html
URL:https://ipa.illinois.gov/renewable-resources.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:45283cc95150@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250601
DTEND;VALUE=DATE:20250602
SUMMARY:[REC_OR] OR RPS annual compliance report due to OPUC (prior calend
 ar year) — Compliance
DESCRIPTION:Oregon RECs / RPS (Oregon PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nIOUs and electricity service suppliers file by June 
 1 (ORS 469A)\; consumer-owned utilities report to their boards/members\; 
 RECs retired via WREGIS\; ACP option under a 4% cost cap\; large utilitie
 s 50% by 2040 (SB 1547). RPS Implementation Plan filed Jan 1 of even year
 s.\nSource: https://www.oregon.gov/energy/energy-oregon/pages/renewable-p
 ortfolio-standard.aspx
URL:https://www.oregon.gov/energy/energy-oregon/pages/renewable-portfolio-
 standard.aspx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:730fbf281f0d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250601
DTEND;VALUE=DATE:20250602
SUMMARY:[REC_WA] WA Energy Independence Act annual report due to Commerce 
 (prior year) — Reporting
DESCRIPTION:Washington RECs / RPS (Washington PUC / RPS program)\nType: Re
 porting\nStatus: Confirmed\nQualifying utilities report annually by June 
 1 (RCW 19.285)\; the 15% renewable target was met (2020). CETA (RCW 19.40
 5) layers a 100%-clean-by-2045 obligation via 4-year Clean Energy Impleme
 ntation Plans and multi-year compliance periods (first CETA interim perfo
 rmance report due July 1\, 2026).\nSource: https://www.utc.wa.gov/regulat
 ed-industries/utilities/energy/conservation-and-renewable-energy-overview
 /washington-energy-independence-act-i-937
URL:https://www.utc.wa.gov/regulated-industries/utilities/energy/conservat
 ion-and-renewable-energy-overview/washington-energy-independence-act-i-937
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4b12e43e92f1@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250601
DTEND;VALUE=DATE:20250602
SUMMARY:[RINS] RFS attest engagement report (RFS 0304T) due — Reporting
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Reporting\nStatus:
  Tentative\nGenerally June 1 following the compliance year\; the exact ye
 ar tracks the compliance-deadline timing.\nSource: https://www.epa.gov/re
 newable-fuel-standard/extension-renewable-fuel-standard-compliance-deadli
 nes-final-rulemaking
URL:https://www.epa.gov/renewable-fuel-standard/extension-renewable-fuel-s
 tandard-compliance-deadlines-final-rulemaking
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:edde92587f3f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250601
DTEND;VALUE=DATE:20250602
SUMMARY:[WA_CFS] Credit Clearance Market window opens\, if required — Mil
 estone
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Milestone\nStatus: Tentative\nRuns June 1 to July 31\; held only if
  parties have unmet obligations (determined by May 15). Max price set by 
 the first Monday of April.\nSource: https://ecology.wa.gov/air-climate/re
 ducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ae97bbc84e67@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250630
DTEND;VALUE=DATE:20250701
SUMMARY:[CFR] Credit-adjustment report due — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nSource: https://www.ccarbon.info/news/eccc-releases-detailed-factshe
 et-on-carbon-intensity-pathway-reports-for-clean-fuel-regulations/
URL:https://www.ccarbon.info/news/eccc-releases-detailed-factsheet-on-carb
 on-intensity-pathway-reports-for-clean-fuel-regulations/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9b4a7f651f42@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250630
DTEND;VALUE=DATE:20250701
SUMMARY:[REC_MI] MI renewable energy annual compliance report due to MPSC 
 (prior year) — Reporting
DESCRIPTION:Michigan RECs / RPS (Michigan PUC / RPS program)\nType: Report
 ing\nStatus: Confirmed\nElectric providers retire RECs in MIRECS at year-
 end and file annual compliance reports in their renewable-energy-plan doc
 kets by June 30\; PA 235 (2023): RPS 50% by 2030\, 60% by 2035\, Clean En
 ergy Standard 100% by 2040\; REP plans filed biennially.\nSource: https:/
 /www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
URL:https://www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cf5d394c2d86@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250630
DTEND;VALUE=DATE:20250701
SUMMARY:[TIER] Verified annual compliance report and true-up obligation du
 e — Compliance
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Compliance\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-
 innovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7788fd92a68e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250701
DTEND;VALUE=DATE:20250702
SUMMARY:[CR_FERC_OIL] FERC oil pipeline index rate-ceiling adjustment take
 s effect — Effective date
DESCRIPTION:FERC Oil Pipeline Tariffs (FERC)\nType: Effective date\nStatus
 : Confirmed\nInterstate oil pipeline rate ceilings adjust each July 1 by 
 the FERC index (PPI-FG - 0.55% for the July 1\, 2026 - June 30\, 2031 ter
 m)\; FERC publishes the annual multiplier in May.\nSource: https://www.fe
 rc.gov/general-information-1/oil-pipeline-index
URL:https://www.ferc.gov/general-information-1/oil-pipeline-index
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:88c7256ac9b1@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250701
DTEND;VALUE=DATE:20250702
SUMMARY:[REC_MA] MA RPS/APS annual compliance filing due to DOER (prior ca
 lendar year) — Compliance
DESCRIPTION:Massachusetts RECs / RPS (Massachusetts PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nCovers RPS Class I/II\, APS\, CES and 
 CPS\; due July 1 (or next business day)\; 225 CMR 14.09/15.09/16.09.\nSou
 rce: https://www.mass.gov/info-details/annual-compliance-reports-and-othe
 r-publications
URL:https://www.mass.gov/info-details/annual-compliance-reports-and-other-
 publications
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:932fa2279c4f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250701
DTEND;VALUE=DATE:20250702
SUMMARY:[REC_NM] NM Renewable Energy Act procurement plan + portfolio repo
 rt due to PRC — Compliance
DESCRIPTION:New Mexico RECs / RPS (New Mexico PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual procurement plan and prior-year portf
 olio report filed on a staggered schedule (El Paso Electric May 1\, PNM J
 une 1\, SPS July 1) under Rule 572 / 62-16-4 NMSA\; ETA 2019: 50% by 2030
 \, 80% by 2040\, 100% carbon-free by 2045\; WREGIS\; RECs carry forward u
 p to 4 years.\nSource: https://www.prc.nm.gov/utilities/renewable-energy/
URL:https://www.prc.nm.gov/utilities/renewable-energy/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:90651ff04a85@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250701
DTEND;VALUE=DATE:20250702
SUMMARY:[REC_NV] NV RPS annual compliance report due to PUCN (prior calend
 ar year) — Compliance
DESCRIPTION:Nevada RECs / RPS (Nevada PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nProviders of electric service file by July 1 (NRS 70
 4.7825)\; 50% by 2030 / 100% carbon-free goal by 2050\; portfolio energy 
 credits (PECs)\; EE counts toward up to 10% (phasing out for 2025+).\nSou
 rce: https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
URL:https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e1cef3ca5128@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250715
DTEND;VALUE=DATE:20250716
SUMMARY:[REC_NH] NH RPS annual compliance filing (Form E-2500) due to Dept
  of Energy — Compliance
DESCRIPTION:New Hampshire RECs / RPS (New Hampshire PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nFiled in the July 1-15 window (RSA 362
 -F:8 as amended by HB 2 sec. 112\, effective 2023)\; Classes I-IV\; NEPOO
 L GIS.\nSource: https://www.energy.nh.gov/renewable-energy/renewable-port
 folio-standard/renewable-portfolio-standard-compliance
URL:https://www.energy.nh.gov/renewable-energy/renewable-portfolio-standar
 d/renewable-portfolio-standard-compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1694ceb1e572@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250715
DTEND;VALUE=DATE:20250716
SUMMARY:[REC_RI] RI Renewable Energy Standard compliance filing due to PUC
  — Compliance
DESCRIPTION:Rhode Island RECs / RPS (Rhode Island PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nWithin 30 days after Q4 NEPOOL GIS repor
 ts (no later than July 15)\; ACP to the Renewable Energy Development Fund
 \; 810-RICR-40-05-2.\nSource: https://ripuc.ri.gov/utility-information/el
 ectric/rhode-island-renewable-energy-standard-ri-res-program
URL:https://ripuc.ri.gov/utility-information/electric/rhode-island-renewab
 le-energy-standard-ri-res-program
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0e9bf972c82e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250801
DTEND;VALUE=DATE:20250802
SUMMARY:[REC_CA_PCC1] CA RPS Annual Compliance Report due to CPUC - PCC1 (
 bundled) — Compliance
DESCRIPTION:California RPS PCC1 (bundled\, delivered) (CPUC / CEC)\nType: 
 Compliance\nStatus: Confirmed\nPCC1 = RPS-eligible generation interconnec
 ted to / scheduled into a CA balancing authority (bundled\, delivered). R
 etail sellers (IOUs/ESPs/CCAs) file the Annual RPS Compliance Report by A
 ug 1 (D.12-06-038)\; measured over 3-year compliance periods\; WREGIS-tra
 cked\; SB 100: 60% by 2030.\nSource: https://www.cpuc.ca.gov/industries-a
 nd-topics/electrical-energy/electric-power-procurement/rps/rps-compliance
 -rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ebe78bfadc6d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250801
DTEND;VALUE=DATE:20250802
SUMMARY:[REC_CA_PCC2] CA RPS Annual Compliance Report due to CPUC - PCC2 (
 firmed & shaped) — Compliance
DESCRIPTION:California RPS PCC2 (firmed & shaped) (CPUC / CEC)\nType: Comp
 liance\nStatus: Confirmed\nPCC2 = firmed-and-shaped / incremental electri
 city with substitute energy. Same Aug 1 CPUC Annual RPS Compliance Report
  (D.12-06-038)\; WREGIS-tracked.\nSource: https://www.cpuc.ca.gov/industr
 ies-and-topics/electrical-energy/electric-power-procurement/rps/rps-compl
 iance-rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3c0e77edb171@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250801
DTEND;VALUE=DATE:20250802
SUMMARY:[REC_CA_PCC3] CA RPS Annual Compliance Report due to CPUC - PCC3 (
 unbundled RECs) — Compliance
DESCRIPTION:California RPS PCC3 (unbundled / TRECs) (CPUC / CEC)\nType: Co
 mpliance\nStatus: Confirmed\nPCC3 = unbundled RECs (TRECs) and products n
 ot qualifying as PCC1/PCC2 - the tradable category\, subject to a procure
 ment cap and portfolio-balance limits. Same Aug 1 CPUC Annual RPS Complia
 nce Report (D.12-06-038).\nSource: https://www.cpuc.ca.gov/industries-and
 -topics/electrical-energy/electric-power-procurement/rps/rps-compliance-r
 ules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:91d1b0200c6b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250831
DTEND;VALUE=DATE:20250901
SUMMARY:[REC_VT] VT Renewable Energy Standard annual compliance filing due
  to PUC — Compliance
DESCRIPTION:Vermont RECs / RPS (Vermont PUC / RPS program)\nType: Complian
 ce\nStatus: Confirmed\nDistribution utilities file by Aug 31 (PUC Docket 
 8550)\; Tiers I/II met by retiring NEPOOL GIS RECs\, plus Tier III energy
  transformation. No retail choice in VT.\nSource: https://publicservice.v
 ermont.gov/renewables/renewable-energy-standard
URL:https://publicservice.vermont.gov/renewables/renewable-energy-standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2d9119801b60@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250901
DTEND;VALUE=DATE:20250902
SUMMARY:[REC_NC] NC REPS/CEPS compliance plan + report due to NCUC — Comp
 liance
DESCRIPTION:North Carolina RECs / RPS (North Carolina PUC / RPS program)\n
 Type: Compliance\nStatus: Confirmed\nElectric power suppliers file the fo
 rward compliance plan (Rule R8-67(b)) and prior-year compliance report (R
 8-67(c)) by Sept 1\; retail-sales data entered into NC-RETS by June 1\; I
 OU target 12.5%\; expanded to CEPS by SL 2023-138\; RECs tracked in NC-RE
 TS.\nSource: https://www.ncuc.gov/Reps/reps.html
URL:https://www.ncuc.gov/Reps/reps.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fcf5b7a9e359@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250901
DTEND;VALUE=DATE:20250902
SUMMARY:[REC_PA] PA AEPS true-up period closes (Tier I/II + solar) — Comp
 liance
DESCRIPTION:Pennsylvania RECs / RPS (Pennsylvania PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nThree-month true-up from the May 31 repo
 rting-year close\; after this the PUC verifies compliance and assesses AC
 P/SACP.\nSource: https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
URL:https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:8639e3ef77bd@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250901
DTEND;VALUE=DATE:20250902
SUMMARY:[TIER] Facility-specific benchmark applications due (upcoming year
 ) — Deadline
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Deadline\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-in
 novation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:573b37d812d3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250928
DTEND;VALUE=DATE:20250929
SUMMARY:[REC_DE] DE RPS compliance report due (~120 days after May 31 clos
 e) — Compliance
DESCRIPTION:Delaware RECs / RPS (Delaware PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nStandard-offer RPS obligation sits with Delmarva
 \; transitional-contract RECs transfer to the standard offer by Aug 1 (90
 %) and Sep 1\; 26 Del. Admin. C. 3008.\nSource: https://depsc.delaware.go
 v/rps-and-green-power-product-compliance/
URL:https://depsc.delaware.gov/rps-and-green-power-product-compliance/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7ecec9bf2ed5@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20250930
DTEND;VALUE=DATE:20251001
SUMMARY:[EU_ETS] Surrender allowances for the prior year's emissions — Co
 mpliance
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Compl
 iance\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/
 carbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fc091224fbcf@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20251001
DTEND;VALUE=DATE:20251002
SUMMARY:[REC_NJ] NJ RPS annual compliance report due to BPU (EY Jun 1-May 
 31) — Compliance
DESCRIPTION:New Jersey RECs / RPS (New Jersey PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual report demonstrating Class I\, Class 
 II and solar (SREC-II/SuSI) compliance for the prior Energy Year\; N.J.A.
 C. 14:8-2.2.\nSource: https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-
 19-15-8A.pdf
URL:https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-19-15-8A.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e29ec99af688@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20251015
DTEND;VALUE=DATE:20251016
SUMMARY:[REC_CT] CT RPS annual compliance filing (Exhibit A) due to PURA 
 — Compliance
DESCRIPTION:Connecticut RECs / RPS (Connecticut PUC / RPS program)\nType: 
 Compliance\nStatus: Confirmed\nDue Oct 15 of the year following the compl
 iance year (docket YEAR-06-01)\; Class I/II/III RECs settle via NEPOOL GI
 S by June 15.\nSource: https://portal.ct.gov/-/media/pura/electric/el-add
 s/master-rps--instructions---final92225.pdf
URL:https://portal.ct.gov/-/media/pura/electric/el-adds/master-rps--instru
 ctions---final92225.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3c587c253c1b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20251031
DTEND;VALUE=DATE:20251101
SUMMARY:[AU_SAFEGUARD] NGER emissions and energy report due (prior financi
 al year) — Reporting
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Reporting\nStatus: Confirmed\nSource: https://www.dcceew.gov.au/
 climate-change/emissions-reporting/national-greenhouse-energy-reporting-s
 cheme/safeguard-mechanism
URL:https://www.dcceew.gov.au/climate-change/emissions-reporting/national-
 greenhouse-energy-reporting-scheme/safeguard-mechanism
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:937a6d30894c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20251101
DTEND;VALUE=DATE:20251102
SUMMARY:[CCA] Annual compliance obligation surrender (approx.) — Complian
 ce
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Compliance\nStatus: Te
 ntative\nAnnual partial-surrender window\; full true-up at the close of e
 ach compliance period.\nSource: https://ww2.arb.ca.gov/our-work/programs/
 cap-and-trade-program
URL:https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-program
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c86163bca1bc@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20251101
DTEND;VALUE=DATE:20251102
SUMMARY:[NG_ACER_GAS] EU gas storage 90% filling target (reference date) 
 — Compliance
DESCRIPTION:ACER Gas (ACER)\nType: Compliance\nStatus: Confirmed\nUnder Re
 gulation (EU) 2025/1733 the 90% storage target may be met any time betwee
 n 1 October and 1 December (replacing the former hard 1 November deadline
 )\, with limited deviations allowed\; in force through 2027. 1 November s
 hown as the reference benchmark.\nSource: https://energy.ec.europa.eu/top
 ics/energy-security/gas-storage_en
URL:https://energy.ec.europa.eu/topics/energy-security/gas-storage_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d1b94014150f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20251101
DTEND;VALUE=DATE:20251102
SUMMARY:[WCA] Annual compliance deadline (30% of prior-year emissions\, 5 
 p.m. PT) — Compliance
DESCRIPTION:Washington Cap-and-Invest (Washington Department of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nRemaining obligation due at the clos
 e of each four-year compliance period.\nSource: https://ecology.wa.gov/ai
 r-climate/climate-commitment-act/cap-and-invest/auctions-and-market/compl
 iance
URL:https://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-inve
 st/auctions-and-market/compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:36707e1c0d88@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20251130
DTEND;VALUE=DATE:20251201
SUMMARY:[RINS] EPA statutory deadline to set the following year's RVO volu
 mes — Milestone
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Milestone\nStatus:
  Tentative\nEPA frequently misses this statutory date\; treat as a target
 \, not a fixed event.\nSource: https://www.congress.gov/crs-product/R43325
URL:https://www.congress.gov/crs-product/R43325
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7a0ee9a2410b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20251215
DTEND;VALUE=DATE:20251216
SUMMARY:[CA_OBPS] Regular-rate compensation deadline (excess emissions) —
  Compliance
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Compliance\nStatus: Confirmed\nIncreased-rate deadline follows in mi
 d-February\; CAD 110/t excess-emissions charge for 2026.\nSource: https:/
 /icapcarbonaction.com/en/ets/canada-federal-output-based-pricing-system
URL:https://icapcarbonaction.com/en/ets/canada-federal-output-based-pricin
 g-system
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c41c8dd49d2c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260225
DTEND;VALUE=DATE:20260226
SUMMARY:[NESO] GB Capacity Market T-4 and T-1 auctions — Auction
DESCRIPTION:National Energy System Operator (Great Britain) (NESO)\nType: 
 Auction\nStatus: Tentative\nAnnual four-year-ahead (T-4) and one-year-ahe
 ad (T-1) capacity auctions\, typically held late February to early March\
 ; exact dates and parameters are set each cycle by DESNZ and NESO.\nSourc
 e: https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
URL:https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1a2c1407c5ee@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260228
DTEND;VALUE=DATE:20260301
SUMMARY:[EU_ETS] Free allocation entered in the Union Registry (approx.) 
 — Allocation
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Alloc
 ation\nStatus: Tentative\nTypically end of February\; confirm against the
  annual allocation timetable.\nSource: https://icapcarbonaction.com/en/et
 s/eu-emissions-trading-system-eu-ets
URL:https://icapcarbonaction.com/en/ets/eu-emissions-trading-system-eu-ets
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e66a43749dcc@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260315
DTEND;VALUE=DATE:20260316
SUMMARY:[TIER] Forecasting report update due (prior data year) — Reportin
 g
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-i
 nnovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c94ed3cf365f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260326
DTEND;VALUE=DATE:20260327
SUMMARY:[MISO] Planning Resource Auction - offer window (last four busines
 s days of March) — Auction
DESCRIPTION:Midcontinent Independent System Operator (MISO)\nType: Auction
 \nStatus: Tentative\nMISO accepts PRA offers in the last four business da
 ys of March and posts results in late April (April 28 in 2026). Seasonal 
 accreditation applies\; exact days vary.\nSource: https://www.misoenergy.
 org/planning/resource-adequacy2/resource-adequacy/
URL:https://www.misoenergy.org/planning/resource-adequacy2/resource-adequa
 cy/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:8b776208e1c3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[AU_SAFEGUARD] Safeguard compliance deadline (surrender ACCUs / SM
 Cs for excess) — Compliance
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Compliance\nStatus: Confirmed\nNet emissions must be at or below
  baseline\; compliance assessed as of 1 April.\nSource: https://cer.gov.a
 u/about-us/our-compliance-approach/compliance-and-enforcement-priorities/
 compliance-and-enforcement-priorities-2025-26
URL:https://cer.gov.au/about-us/our-compliance-approach/compliance-and-enf
 orcement-priorities/compliance-and-enforcement-priorities-2025-26
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dbe10a966f20@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[BC_LCFS] Annual compliance report due (prior compliance year) — 
 Compliance
DESCRIPTION:BC Low Carbon Fuels (BC Ministry of Energy and Climate Solutio
 ns)\nType: Compliance\nStatus: Confirmed\nCompliance period aligns with t
 he calendar year\; reports due on or before March 31.\nSource: https://ww
 w2.gov.bc.ca/gov/content/industry/electricity-alternative-energy/transpor
 tation-energies/renewable-low-carbon-fuels/requirements
URL:https://www2.gov.bc.ca/gov/content/industry/electricity-alternative-en
 ergy/transportation-energies/renewable-low-carbon-fuels/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a59453f29be1@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[EU_ETS] Report verified emissions for the prior year (Union Regis
 try) — Reporting
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Repor
 ting\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/c
 arbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6bd4eadefd50@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[LCFS] Annual compliance / fuel pathway report due (prior data yea
 r) — Reporting
DESCRIPTION:Low Carbon Fuel Standard (CARB)\nType: Reporting\nStatus: Conf
 irmed\nSource: https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-s
 tandard/lcfs-registration-and-reporting
URL:https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-standard/lcfs
 -registration-and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e737b9589020@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[REC_HI] HI RPS annual status report to PUC (Docket 2007-0008) — 
 Reporting
DESCRIPTION:Hawaii RECs / RPS (Hawaii PUC / RPS program)\nType: Reporting\
 nStatus: Tentative\nHECO companies and KIUC file annual RPS status report
 s with the PUC under HRS 269-95\; 100% by 2045 on a net-generation basis 
 (Act 140\, 2022). Islanded grids - no external REC trading market. Exact 
 statutory filing date varies\; approximate marker.\nSource: https://puc.h
 awaii.gov/reports/energy-reports/renewable-portfolio-standards-rps-annual
 -reports/
URL:https://puc.hawaii.gov/reports/energy-reports/renewable-portfolio-stan
 dards-rps-annual-reports/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:197d32ade511@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[REC_ME] ME PUC annual RPS report (CEP compliance reports feed in)
  — Reporting
DESCRIPTION:Maine RECs / RPS (Maine PUC / RPS program)\nType: Reporting\nS
 tatus: Tentative\nMaine PUC publishes its annual RPS report to the Legisl
 ature ~Mar 31 (35-A M.R.S. 3210)\; competitive electricity providers self
 -report and settle RECs via NEPOOL GIS. Exact CEP filing date set by PUC 
 instructions.\nSource: https://www.maine.gov/mpuc/regulated-utilities/ele
 ctricity/renewable-programs/rps
URL:https://www.maine.gov/mpuc/regulated-utilities/electricity/renewable-p
 rograms/rps
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a9bfb2dbdaa8@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[REC_NY] NY Clean Energy Standard annual reconciliation (Tier 1/Ti
 er 4/ZEC) — True-up
DESCRIPTION:New York RECs / RPS (New York PUC / RPS program)\nType: True-u
 p\nStatus: Tentative\nPay-as-you-go: LSEs remit monthly obligation paymen
 ts to NYSERDA within 15 days of invoice\; after the Jan 1-Dec 31 complian
 ce year NYSERDA reconciles against final NYISO load. Annual reconciliatio
 n date varies\; ZEC runs on a fiscal-year basis. Tracked in NYGATS.\nSour
 ce: https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obl
 igations/Compliance
URL:https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obli
 gations/Compliance
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:93d55e680408@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[UK_ETS] Verified annual emissions report due — Reporting
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.gov.uk/government/publi
 cations/participating-in-the-uk-ets/participating-in-the-uk-ets
URL:https://www.gov.uk/government/publications/participating-in-the-uk-ets
 /participating-in-the-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3d70a0b27cc8@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260331
DTEND;VALUE=DATE:20260401
SUMMARY:[WA_CFS] Q4 quarterly report due (prior year) — Reporting
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Reporting\nStatus: Confirmed\nQuarterly reports are due about 90 da
 ys after each quarter-end\; March 31 is the Q4 deadline.\nSource: https:/
 /ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/clean-fuel-
 standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f82282093a64@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260401
DTEND;VALUE=DATE:20260402
SUMMARY:[REC_DC] DC RPS supplier compliance report due to DCPSC (prior cal
 endar year) — Compliance
DESCRIPTION:Washington DC RECs / RPS (Washington DC PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nDue by April 1 of the year following t
 he compliance year\; high-value solar carve-out (DC SRECs)\; DCMR Title 1
 5\, Ch. 29.\nSource: https://dcpsc.org/getattachment/Orders-and-Regulatio
 ns/Orders-Rules-and-Regulations/District-of-Columbia-Municipal-Regulation
 s-Title-1/15-29-Compiled-(Updated-April-2022).pdf.aspx?lang=en-US
URL:https://dcpsc.org/getattachment/Orders-and-Regulations/Orders-Rules-an
 d-Regulations/District-of-Columbia-Municipal-Regulations-Title-1/15-29-Co
 mpiled-(Updated-April-2022).pdf.aspx?lang=en-US
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:febff8098393@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260401
DTEND;VALUE=DATE:20260402
SUMMARY:[REC_MD] MD RPS supplier compliance report due to PSC (prior calen
 dar year) — Compliance
DESCRIPTION:Maryland RECs / RPS (Maryland PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nOn or before April 1 each supplier files its RPS
  report and retires Tier 1/Tier 1 solar/Tier 2 RECs\; COMAR 20.61.04.02.\
 nSource: https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-
 02
URL:https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-02
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c2751c37dfa3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260415
DTEND;VALUE=DATE:20260416
SUMMARY:[REC_MO] MO RES annual compliance report due to PSC (prior calenda
 r year) — Compliance
DESCRIPTION:Missouri RECs / RPS (Missouri PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nInvestor-owned utilities (Ameren Missouri\, Ever
 gy\, Empire) file annual RES compliance reports and forward compliance pl
 ans under 20 CSR 4240-20.100\; 15% by 2021 with a 2% solar carve-out and 
 a 1% rate-impact cap\; RECs tracked in MRETS.\nSource: https://psc.mo.gov
 /electric/Renewable_Energy_Standard_Compliance_Reports
URL:https://psc.mo.gov/electric/Renewable_Energy_Standard_Compliance_Repor
 ts
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fd6dfb55a8ff@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260415
DTEND;VALUE=DATE:20260416
SUMMARY:[REC_OH] OH renewable portfolio annual status report due to PUCO (
 prior year) — Compliance
DESCRIPTION:Ohio RECs / RPS (Ohio PUC / RPS program)\nType: Compliance\nSt
 atus: Confirmed\nEDUs and CRES providers file by April 15\; standard caps
  at 8.5% by 2026\; OAC 4901:1-40-05.\nSource: https://puco.ohio.gov/utili
 ties/electricity/resources/ohio-renewable-energy-portfolio-standard/rps-f
 iling-faqs
URL:https://puco.ohio.gov/utilities/electricity/resources/ohio-renewable-e
 nergy-portfolio-standard/rps-filing-faqs
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:37296f9f6514@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260415
DTEND;VALUE=DATE:20260416
SUMMARY:[REC_WI] WI RPS annual compliance demonstration due to PSCW (prior
  calendar year) — Compliance
DESCRIPTION:Wisconsin RECs / RPS (Wisconsin PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nElectric providers demonstrate compliance by A
 pril 15 by retiring RECs/RRCs in M-RETS\; Wis. Stat. 196.378. Statewide 1
 0% goal (2015) met\; provider-specific baseline+6% requirements continue 
 indefinitely.\nSource: https://psc.wi.gov/Pages/ServiceType/Energy/Renewa
 bles/RpsCompliance.aspx
URL:https://psc.wi.gov/Pages/ServiceType/Energy/Renewables/RpsCompliance.a
 spx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4861bcced8bd@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260418
DTEND;VALUE=DATE:20260419
SUMMARY:[NG_FERC] FERC Form 2 / 2-A annual report due (interstate gas pipe
 lines) — Reporting
DESCRIPTION:FERC Natural Gas (FERC)\nType: Reporting\nStatus: Confirmed\nA
 nnual financial and operational report for major / non-major interstate n
 atural gas pipelines\; due April 18 of the following year under 18 CFR 26
 0.1-260.2.\nSource: https://www.ferc.gov/industries-data/natural-gas/indu
 stry-forms
URL:https://www.ferc.gov/industries-data/natural-gas/industry-forms
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c612601bacbc@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260430
DTEND;VALUE=DATE:20260501
SUMMARY:[CFR] Annual Credit Creation Report due (CATS) — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nCC1 and CC3 credits are created on April 30 with this report\; CI-Pa
 thway Reports share this deadline.\nSource: https://data-donnees.az.ec.gc
 .ca/data/climate/products/clean-fuel-regulations-credit-market-reporting?
 lang=en
URL:https://data-donnees.az.ec.gc.ca/data/climate/products/clean-fuel-regu
 lations-credit-market-reporting?lang=en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3c945217f4ec@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260430
DTEND;VALUE=DATE:20260501
SUMMARY:[OR_CFP] Annual compliance report due (balance credits and deficit
 s) — Compliance
DESCRIPTION:Oregon Clean Fuels Program (Oregon DEQ)\nType: Compliance\nSta
 tus: Tentative\nLCFS-family April 30 standard\; confirm on Oregon DEQ's C
 FP calendar. Quarterly progress reports are due about 90 days after each 
 quarter-end.\nSource: https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overv
 iew.aspx
URL:https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overview.aspx
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fb02b981b747@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260430
DTEND;VALUE=DATE:20260501
SUMMARY:[UK_ETS] Surrender allowances for the prior scheme year — Complia
 nce
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Compliance\nStatus: Confirmed\nA double-surrender easing applies for the 
 2026-2027 maritime years (both due 30 April 2028).\nSource: https://icapc
 arbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
URL:https://icapcarbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3498afcdccad@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260430
DTEND;VALUE=DATE:20260501
SUMMARY:[WA_CFS] Annual compliance report due (prior compliance year) — C
 ompliance
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nSource: https://ecology.wa.gov/air-c
 limate/reducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b7a5c92a4720@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260501
DTEND;VALUE=DATE:20260502
SUMMARY:[REC_MN] MN RES/Solar Standard REC retirement deadline (prior cale
 ndar year) — Compliance
DESCRIPTION:Minnesota RECs / RPS (Minnesota PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nRECs for the prior compliance year retired in 
 M-RETS by May 1\; annual verification report (RES\, Solar Energy Standard
 \, Green Pricing) filed with the PUC by June 1. 2023 law: 55% renewable b
 y 2035\, 100% carbon-free by 2040\; REC shelf life = generation year + 4.
 \nSource: https://mn.gov/commerce-stat/energy/industry-government/utiliti
 es/annual-reporting/notice_26-12_final_signed.pdf
URL:https://mn.gov/commerce-stat/energy/industry-government/utilities/annu
 al-reporting/notice_26-12_final_signed.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0a8b32171d1b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260501
DTEND;VALUE=DATE:20260502
SUMMARY:[REC_VA] VA VCEA RPS annual development plan filed with SCC (Domin
 ion ~May 1) — Compliance
DESCRIPTION:Virginia RECs / RPS (Virginia PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nProceeding-based: Dominion (~May 1) and APCo (la
 te April) file annual RPS development plans (Va. Code 56-585.5(D))\; comp
 liance demonstrated by retiring RECs every year via PJM-GATS\; 100% by 20
 45 (Dominion) / 2050 (APCo)\; from 2025\, 75% of Dominion's RECs must be 
 Virginia-sited.\nSource: https://www.scc.virginia.gov/regulated-industrie
 s/utility-regulation/energy-regulation/renewable-resources/arbs/
URL:https://www.scc.virginia.gov/regulated-industries/utility-regulation/e
 nergy-regulation/renewable-resources/arbs/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:abdc8eef32df@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:[CA_OBPS] Annual report and verification report due — Reporting
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Reporting\nStatus: Confirmed\nFederal OBPS now applies only in Manit
 oba\, PEI\, Yukon and Nunavut\; most large emitters sit under provincial 
 systems.\nSource: https://www.canada.ca/en/environment-climate-change/ser
 vices/climate-change/pricing-pollution-how-it-will-work/output-based-pric
 ing-system.html
URL:https://www.canada.ca/en/environment-climate-change/services/climate-c
 hange/pricing-pollution-how-it-will-work/output-based-pricing-system.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d3276e0a376f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:[QC_CAT] Annual verified GHG emissions report (SGE GES) — Reporti
 ng
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Reporti
 ng\nStatus: Tentative\nApproximate\; confirm the exact Quebec reporting d
 ate.\nSource: https://www.environnement.gouv.qc.ca/changementsclimatiques
 /marche-carbone_en.asp
URL:https://www.environnement.gouv.qc.ca/changementsclimatiques/marche-car
 bone_en.asp
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2b60466a7b8c@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:[REC_CO] CO RES annual compliance report due to PUC (prior calenda
 r year) — Compliance
DESCRIPTION:Colorado RECs / RPS (Colorado PUC / RPS program)\nType: Compli
 ance\nStatus: Tentative\nQualifying retail utilities (Xcel/Public Service
 \, Black Hills) and wholesale utilities (Tri-State) file annual RES compl
 iance reports under PUC Rule 3662 (4 CCR 723-3) ~June 1\, plus forward co
 mpliance plans\; 30% by 2020 (IOUs)\; SB19-236 clean-energy 80% by 2030 /
  100% by 2050 goals\; WREGIS-tracked. Exact date approximate.\nSource: ht
 tps://puc.colorado.gov/utilityforms
URL:https://puc.colorado.gov/utilityforms
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:233300862c77@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:[REC_IL] IL RPS delivery year begins (Jun 1-May 31) - IPA-procured
  — Milestone
DESCRIPTION:Illinois RECs / RPS (Illinois PUC / RPS program)\nType: Milest
 one\nStatus: Confirmed\nIllinois RPS is procurement-based: the Illinois P
 ower Agency procures RECs for ComEd/Ameren/MidAmerican via its Long-Term 
 Plan (Illinois Shines/ABP). Per-supplier ARES REC obligations phased out 
 after the 2018-19 delivery year. Indexed-REC procurements run on calendar
  years\; other procurements on the delivery year.\nSource: https://ipa.il
 linois.gov/renewable-resources.html
URL:https://ipa.illinois.gov/renewable-resources.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2ab7ecf7f0dc@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:[REC_OR] OR RPS annual compliance report due to OPUC (prior calend
 ar year) — Compliance
DESCRIPTION:Oregon RECs / RPS (Oregon PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nIOUs and electricity service suppliers file by June 
 1 (ORS 469A)\; consumer-owned utilities report to their boards/members\; 
 RECs retired via WREGIS\; ACP option under a 4% cost cap\; large utilitie
 s 50% by 2040 (SB 1547). RPS Implementation Plan filed Jan 1 of even year
 s.\nSource: https://www.oregon.gov/energy/energy-oregon/pages/renewable-p
 ortfolio-standard.aspx
URL:https://www.oregon.gov/energy/energy-oregon/pages/renewable-portfolio-
 standard.aspx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:8995f7652c24@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:[REC_WA] WA Energy Independence Act annual report due to Commerce 
 (prior year) — Reporting
DESCRIPTION:Washington RECs / RPS (Washington PUC / RPS program)\nType: Re
 porting\nStatus: Confirmed\nQualifying utilities report annually by June 
 1 (RCW 19.285)\; the 15% renewable target was met (2020). CETA (RCW 19.40
 5) layers a 100%-clean-by-2045 obligation via 4-year Clean Energy Impleme
 ntation Plans and multi-year compliance periods (first CETA interim perfo
 rmance report due July 1\, 2026).\nSource: https://www.utc.wa.gov/regulat
 ed-industries/utilities/energy/conservation-and-renewable-energy-overview
 /washington-energy-independence-act-i-937
URL:https://www.utc.wa.gov/regulated-industries/utilities/energy/conservat
 ion-and-renewable-energy-overview/washington-energy-independence-act-i-937
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3bd3a4d04848@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:[RINS] RFS attest engagement report (RFS 0304T) due — Reporting
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Reporting\nStatus:
  Tentative\nGenerally June 1 following the compliance year\; the exact ye
 ar tracks the compliance-deadline timing.\nSource: https://www.epa.gov/re
 newable-fuel-standard/extension-renewable-fuel-standard-compliance-deadli
 nes-final-rulemaking
URL:https://www.epa.gov/renewable-fuel-standard/extension-renewable-fuel-s
 tandard-compliance-deadlines-final-rulemaking
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ec51bf18eda3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260601
DTEND;VALUE=DATE:20260602
SUMMARY:[WA_CFS] Credit Clearance Market window opens\, if required — Mil
 estone
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Milestone\nStatus: Tentative\nRuns June 1 to July 31\; held only if
  parties have unmet obligations (determined by May 15). Max price set by 
 the first Monday of April.\nSource: https://ecology.wa.gov/air-climate/re
 ducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9cc2b071569f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260630
DTEND;VALUE=DATE:20260701
SUMMARY:[CFR] Credit-adjustment report due — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nSource: https://www.ccarbon.info/news/eccc-releases-detailed-factshe
 et-on-carbon-intensity-pathway-reports-for-clean-fuel-regulations/
URL:https://www.ccarbon.info/news/eccc-releases-detailed-factsheet-on-carb
 on-intensity-pathway-reports-for-clean-fuel-regulations/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4a4f32a04b30@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260630
DTEND;VALUE=DATE:20260701
SUMMARY:[REC_MI] MI renewable energy annual compliance report due to MPSC 
 (prior year) — Reporting
DESCRIPTION:Michigan RECs / RPS (Michigan PUC / RPS program)\nType: Report
 ing\nStatus: Confirmed\nElectric providers retire RECs in MIRECS at year-
 end and file annual compliance reports in their renewable-energy-plan doc
 kets by June 30\; PA 235 (2023): RPS 50% by 2030\, 60% by 2035\, Clean En
 ergy Standard 100% by 2040\; REP plans filed biennially.\nSource: https:/
 /www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
URL:https://www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6c9a30b899e3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260630
DTEND;VALUE=DATE:20260701
SUMMARY:[TIER] Verified annual compliance report and true-up obligation du
 e — Compliance
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Compliance\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-
 innovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2c3ca7adf20e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
SUMMARY:[CR_FERC_OIL] FERC oil pipeline index rate-ceiling adjustment take
 s effect — Effective date
DESCRIPTION:FERC Oil Pipeline Tariffs (FERC)\nType: Effective date\nStatus
 : Confirmed\nInterstate oil pipeline rate ceilings adjust each July 1 by 
 the FERC index (PPI-FG - 0.55% for the July 1\, 2026 - June 30\, 2031 ter
 m)\; FERC publishes the annual multiplier in May.\nSource: https://www.fe
 rc.gov/general-information-1/oil-pipeline-index
URL:https://www.ferc.gov/general-information-1/oil-pipeline-index
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ea62b2caedf0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
SUMMARY:[REC_MA] MA RPS/APS annual compliance filing due to DOER (prior ca
 lendar year) — Compliance
DESCRIPTION:Massachusetts RECs / RPS (Massachusetts PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nCovers RPS Class I/II\, APS\, CES and 
 CPS\; due July 1 (or next business day)\; 225 CMR 14.09/15.09/16.09.\nSou
 rce: https://www.mass.gov/info-details/annual-compliance-reports-and-othe
 r-publications
URL:https://www.mass.gov/info-details/annual-compliance-reports-and-other-
 publications
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e12af7bb8cb6@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
SUMMARY:[REC_NM] NM Renewable Energy Act procurement plan + portfolio repo
 rt due to PRC — Compliance
DESCRIPTION:New Mexico RECs / RPS (New Mexico PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual procurement plan and prior-year portf
 olio report filed on a staggered schedule (El Paso Electric May 1\, PNM J
 une 1\, SPS July 1) under Rule 572 / 62-16-4 NMSA\; ETA 2019: 50% by 2030
 \, 80% by 2040\, 100% carbon-free by 2045\; WREGIS\; RECs carry forward u
 p to 4 years.\nSource: https://www.prc.nm.gov/utilities/renewable-energy/
URL:https://www.prc.nm.gov/utilities/renewable-energy/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fdd9d4817012@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
SUMMARY:[REC_NV] NV RPS annual compliance report due to PUCN (prior calend
 ar year) — Compliance
DESCRIPTION:Nevada RECs / RPS (Nevada PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nProviders of electric service file by July 1 (NRS 70
 4.7825)\; 50% by 2030 / 100% carbon-free goal by 2050\; portfolio energy 
 credits (PECs)\; EE counts toward up to 10% (phasing out for 2025+).\nSou
 rce: https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
URL:https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:afc47dcf6e00@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
SUMMARY:[RGGI] Virginia resumes RGGI participation (compliance for H2 2026
 ) — Milestone
DESCRIPTION:Regional Greenhouse Gas Initiative (RGGI\, Inc. / participatin
 g states)\nType: Milestone\nStatus: Confirmed\nHB29 signed Feb 2026\; VA 
 aligns with the Third Program Review Model Rule by Jan 1\, 2027.\nSource:
  https://www.rggi.org/program-overview-and-design/new-participation
URL:https://www.rggi.org/program-overview-and-design/new-participation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:50a5078f613d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260701
DTEND;VALUE=DATE:20260702
SUMMARY:[UK_ETS] UK ETS maritime regime begins (domestic shipping >= 5\,00
 0 GT) — Effective date
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Effective date\nStatus: Confirmed\nSource: https://www.gov.uk/government/
 publications/participating-in-the-uk-ets/participating-in-the-uk-ets
URL:https://www.gov.uk/government/publications/participating-in-the-uk-ets
 /participating-in-the-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f8f13c9e49a0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260703
DTEND;VALUE=DATE:20260704
SUMMARY:[QC_CAT] Draft C&T amendment regulation — public consultation clo
 ses — Comment deadline
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Comment
  deadline\nStatus: Confirmed\nConsultation open May 20 to July 3\, 2026.\
 nSource: https://www.environnement.gouv.qc.ca/changementsclimatiques/marc
 he-carbone_en.asp
URL:https://www.environnement.gouv.qc.ca/changementsclimatiques/marche-car
 bone_en.asp
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a21f13cdcaca@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260715
DTEND;VALUE=DATE:20260716
SUMMARY:[PJM] Base Residual Auction (next\; resuming the three-year-forwar
 d cycle) — Auction
DESCRIPTION:PJM Interconnection (PJM Interconnection\, L.L.C.)\nType: Auct
 ion\nStatus: Tentative\nPJM's next BRA\, scheduled for July 2026 as it re
 turns to the three-year-forward schedule. Exact dates are set in PJM's RP
 M Auction Schedule.\nSource: https://www.pjm.com/-/media/markets-ops/rpm/
 rpm-auction-info/rpm-auction-schedule.ashx
URL:https://www.pjm.com/-/media/markets-ops/rpm/rpm-auction-info/rpm-aucti
 on-schedule.ashx
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:9068ceda10c4@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260715
DTEND;VALUE=DATE:20260716
SUMMARY:[REC_NH] NH RPS annual compliance filing (Form E-2500) due to Dept
  of Energy — Compliance
DESCRIPTION:New Hampshire RECs / RPS (New Hampshire PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nFiled in the July 1-15 window (RSA 362
 -F:8 as amended by HB 2 sec. 112\, effective 2023)\; Classes I-IV\; NEPOO
 L GIS.\nSource: https://www.energy.nh.gov/renewable-energy/renewable-port
 folio-standard/renewable-portfolio-standard-compliance
URL:https://www.energy.nh.gov/renewable-energy/renewable-portfolio-standar
 d/renewable-portfolio-standard-compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:327d02a12fea@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260715
DTEND;VALUE=DATE:20260716
SUMMARY:[REC_RI] RI Renewable Energy Standard compliance filing due to PUC
  — Compliance
DESCRIPTION:Rhode Island RECs / RPS (Rhode Island PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nWithin 30 days after Q4 NEPOOL GIS repor
 ts (no later than July 15)\; ACP to the Renewable Energy Development Fund
 \; 810-RICR-40-05-2.\nSource: https://ripuc.ri.gov/utility-information/el
 ectric/rhode-island-renewable-energy-standard-ri-res-program
URL:https://ripuc.ri.gov/utility-information/electric/rhode-island-renewab
 le-energy-standard-ri-res-program
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bdb413f51aee@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260720
DTEND;VALUE=DATE:20260721
SUMMARY:[CCA] Q3 joint auction — application period closes — Deadline
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Deadline\nStatus: Conf
 irmed\nSource: https://ww2.arb.ca.gov/sites/default/files/2025-12/2026_au
 ction_dates.pdf
URL:https://ww2.arb.ca.gov/sites/default/files/2025-12/2026_auction_dates.
 pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:87b88aaeed81@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260801
DTEND;VALUE=DATE:20260802
SUMMARY:[REC_CA_PCC1] CA RPS Annual Compliance Report due to CPUC - PCC1 (
 bundled) — Compliance
DESCRIPTION:California RPS PCC1 (bundled\, delivered) (CPUC / CEC)\nType: 
 Compliance\nStatus: Confirmed\nPCC1 = RPS-eligible generation interconnec
 ted to / scheduled into a CA balancing authority (bundled\, delivered). R
 etail sellers (IOUs/ESPs/CCAs) file the Annual RPS Compliance Report by A
 ug 1 (D.12-06-038)\; measured over 3-year compliance periods\; WREGIS-tra
 cked\; SB 100: 60% by 2030.\nSource: https://www.cpuc.ca.gov/industries-a
 nd-topics/electrical-energy/electric-power-procurement/rps/rps-compliance
 -rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:aad52d8c1702@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260801
DTEND;VALUE=DATE:20260802
SUMMARY:[REC_CA_PCC2] CA RPS Annual Compliance Report due to CPUC - PCC2 (
 firmed & shaped) — Compliance
DESCRIPTION:California RPS PCC2 (firmed & shaped) (CPUC / CEC)\nType: Comp
 liance\nStatus: Confirmed\nPCC2 = firmed-and-shaped / incremental electri
 city with substitute energy. Same Aug 1 CPUC Annual RPS Compliance Report
  (D.12-06-038)\; WREGIS-tracked.\nSource: https://www.cpuc.ca.gov/industr
 ies-and-topics/electrical-energy/electric-power-procurement/rps/rps-compl
 iance-rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3271487dfbe0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260801
DTEND;VALUE=DATE:20260802
SUMMARY:[REC_CA_PCC3] CA RPS Annual Compliance Report due to CPUC - PCC3 (
 unbundled RECs) — Compliance
DESCRIPTION:California RPS PCC3 (unbundled / TRECs) (CPUC / CEC)\nType: Co
 mpliance\nStatus: Confirmed\nPCC3 = unbundled RECs (TRECs) and products n
 ot qualifying as PCC1/PCC2 - the tradable category\, subject to a procure
 ment cap and portfolio-balance limits. Same Aug 1 CPUC Annual RPS Complia
 nce Report (D.12-06-038).\nSource: https://www.cpuc.ca.gov/industries-and
 -topics/electrical-energy/electric-power-procurement/rps/rps-compliance-r
 ules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0f7db2d75b91@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260819
DTEND;VALUE=DATE:20260820
SUMMARY:[CCA] California-Quebec joint allowance auction (Q3 2026) — Aucti
 on
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Auction\nStatus: Confi
 rmed\nSource: https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-prog
 ram/auction-information
URL:https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-program/auction
 -information
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ba8d5b48d9db@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260819
DTEND;VALUE=DATE:20260820
SUMMARY:[QC_CAT] California-Quebec joint allowance auction (Q3 2026) — Au
 ction
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Auction
 \nStatus: Confirmed\nSource: https://www.environnement.gouv.qc.ca/changem
 entsclimatiques/marche-carbone_en.asp
URL:https://www.environnement.gouv.qc.ca/changementsclimatiques/marche-car
 bone_en.asp
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:36c8543c9840@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260831
DTEND;VALUE=DATE:20260901
SUMMARY:[LCFS] 2025 data-year verification statements due — Reporting
DESCRIPTION:Low Carbon Fuel Standard (CARB)\nType: Reporting\nStatus: Tent
 ative\nRoughly five months after the annual report\; confirm exact day on
  the CARB LCFS compliance calendar.\nSource: https://ww2.arb.ca.gov/our-w
 ork/programs/low-carbon-fuel-standard/lcfs-registration-and-reporting
URL:https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-standard/lcfs
 -registration-and-reporting
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dd07d629d51b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260831
DTEND;VALUE=DATE:20260901
SUMMARY:[REC_VT] VT Renewable Energy Standard annual compliance filing due
  to PUC — Compliance
DESCRIPTION:Vermont RECs / RPS (Vermont PUC / RPS program)\nType: Complian
 ce\nStatus: Confirmed\nDistribution utilities file by Aug 31 (PUC Docket 
 8550)\; Tiers I/II met by retiring NEPOOL GIS RECs\, plus Tier III energy
  transformation. No retail choice in VT.\nSource: https://publicservice.v
 ermont.gov/renewables/renewable-energy-standard
URL:https://publicservice.vermont.gov/renewables/renewable-energy-standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1239cacc7913@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260901
DTEND;VALUE=DATE:20260902
SUMMARY:[CCA] 2026 Cap-and-Invest amendments take effect — Effective date
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Effective date\nStatus
 : Confirmed\nSource: https://ww2.arb.ca.gov/news/carb-adopts-updates-cali
 fornias-cap-and-invest-program-support-affordability-and-align-climate
URL:https://ww2.arb.ca.gov/news/carb-adopts-updates-californias-cap-and-in
 vest-program-support-affordability-and-align-climate
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:444e81900cf2@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260901
DTEND;VALUE=DATE:20260902
SUMMARY:[REC_NC] NC REPS/CEPS compliance plan + report due to NCUC — Comp
 liance
DESCRIPTION:North Carolina RECs / RPS (North Carolina PUC / RPS program)\n
 Type: Compliance\nStatus: Confirmed\nElectric power suppliers file the fo
 rward compliance plan (Rule R8-67(b)) and prior-year compliance report (R
 8-67(c)) by Sept 1\; retail-sales data entered into NC-RETS by June 1\; I
 OU target 12.5%\; expanded to CEPS by SL 2023-138\; RECs tracked in NC-RE
 TS.\nSource: https://www.ncuc.gov/Reps/reps.html
URL:https://www.ncuc.gov/Reps/reps.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f9cd081ccbab@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260901
DTEND;VALUE=DATE:20260902
SUMMARY:[REC_PA] PA AEPS true-up period closes (Tier I/II + solar) — Comp
 liance
DESCRIPTION:Pennsylvania RECs / RPS (Pennsylvania PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nThree-month true-up from the May 31 repo
 rting-year close\; after this the PUC verifies compliance and assesses AC
 P/SACP.\nSource: https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
URL:https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5660d25301b2@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260901
DTEND;VALUE=DATE:20260902
SUMMARY:[RINS] 2025 RFS compliance demonstration deadline — Compliance
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Compliance\nStatus
 : Tentative\nIdentified as the likely 2025 compliance date in litigation 
 over RIN expiry\; confirm against EPA.\nSource: https://www.federalregist
 er.gov/documents/2026/04/01/2026-06275/renewable-fuel-standard-rfs-progra
 m-standards-for-2026-and-2027-partial-waiver-of-2025-cellulosic
URL:https://www.federalregister.gov/documents/2026/04/01/2026-06275/renewa
 ble-fuel-standard-rfs-program-standards-for-2026-and-2027-partial-waiver-
 of-2025-cellulosic
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:3edad303fd18@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260901
DTEND;VALUE=DATE:20260902
SUMMARY:[TIER] Facility-specific benchmark applications due (upcoming year
 ) — Deadline
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Deadline\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-in
 novation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5fada98eb9ad@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260902
DTEND;VALUE=DATE:20260903
SUMMARY:[WCA] Washington Cap-and-Invest quarterly auction (Q3 2026) — Auc
 tion
DESCRIPTION:Washington Cap-and-Invest (Washington Department of Ecology)\n
 Type: Auction\nStatus: Tentative\nFirst-Wednesday quarterly pattern\; con
 firm against Ecology's 2026 Summary of Expected Auction Dates.\nSource: h
 ttps://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-invest/a
 uctions-and-market
URL:https://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-inve
 st/auctions-and-market
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:caa36231681f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260909
DTEND;VALUE=DATE:20260910
SUMMARY:[RGGI] RGGI Auction 73 (Q3 2026) — Auction
DESCRIPTION:Regional Greenhouse Gas Initiative (RGGI\, Inc. / participatin
 g states)\nType: Auction\nStatus: Confirmed\nSept 9 per RGGI\; Virginia's
  first auction since rejoining.\nSource: https://www.rggi.org/auctions/up
 coming-auctions
URL:https://www.rggi.org/auctions/upcoming-auctions
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bd79ec98efc7@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260928
DTEND;VALUE=DATE:20260929
SUMMARY:[REC_DE] DE RPS compliance report due (~120 days after May 31 clos
 e) — Compliance
DESCRIPTION:Delaware RECs / RPS (Delaware PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nStandard-offer RPS obligation sits with Delmarva
 \; transitional-contract RECs transfer to the standard offer by Aug 1 (90
 %) and Sep 1\; 26 Del. Admin. C. 3008.\nSource: https://depsc.delaware.go
 v/rps-and-green-power-product-compliance/
URL:https://depsc.delaware.gov/rps-and-green-power-product-compliance/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:469584b0ba93@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20260930
DTEND;VALUE=DATE:20261001
SUMMARY:[EU_ETS] Surrender allowances for the prior year's emissions — Co
 mpliance
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Compl
 iance\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/
 carbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b192f77137d5@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261001
DTEND;VALUE=DATE:20261002
SUMMARY:[REC_NJ] NJ RPS annual compliance report due to BPU (EY Jun 1-May 
 31) — Compliance
DESCRIPTION:New Jersey RECs / RPS (New Jersey PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual report demonstrating Class I\, Class 
 II and solar (SREC-II/SuSI) compliance for the prior Energy Year\; N.J.A.
 C. 14:8-2.2.\nSource: https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-
 19-15-8A.pdf
URL:https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-19-15-8A.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5e113eb938bc@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:[REC_CT] CT RPS annual compliance filing (Exhibit A) due to PURA 
 — Compliance
DESCRIPTION:Connecticut RECs / RPS (Connecticut PUC / RPS program)\nType: 
 Compliance\nStatus: Confirmed\nDue Oct 15 of the year following the compl
 iance year (docket YEAR-06-01)\; Class I/II/III RECs settle via NEPOOL GI
 S by June 15.\nSource: https://portal.ct.gov/-/media/pura/electric/el-add
 s/master-rps--instructions---final92225.pdf
URL:https://portal.ct.gov/-/media/pura/electric/el-adds/master-rps--instru
 ctions---final92225.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c3c04cd04b26@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261019
DTEND;VALUE=DATE:20261020
SUMMARY:[CCA] Q4 joint auction — application period closes — Deadline
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Deadline\nStatus: Conf
 irmed\nSource: https://ww2.arb.ca.gov/sites/default/files/2025-12/2026_au
 ction_dates.pdf
URL:https://ww2.arb.ca.gov/sites/default/files/2025-12/2026_auction_dates.
 pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:05b9f1dddaf0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261031
DTEND;VALUE=DATE:20261101
SUMMARY:[AU_SAFEGUARD] NGER emissions and energy report due (prior financi
 al year) — Reporting
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Reporting\nStatus: Confirmed\nSource: https://www.dcceew.gov.au/
 climate-change/emissions-reporting/national-greenhouse-energy-reporting-s
 cheme/safeguard-mechanism
URL:https://www.dcceew.gov.au/climate-change/emissions-reporting/national-
 greenhouse-energy-reporting-scheme/safeguard-mechanism
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4dd38b01bedd@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261101
DTEND;VALUE=DATE:20261102
SUMMARY:[CCA] Annual compliance obligation surrender (approx.) — Complian
 ce
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Compliance\nStatus: Te
 ntative\nAnnual partial-surrender window\; full true-up at the close of e
 ach compliance period.\nSource: https://ww2.arb.ca.gov/our-work/programs/
 cap-and-trade-program
URL:https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-program
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4e270491530a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261101
DTEND;VALUE=DATE:20261102
SUMMARY:[NG_ACER_GAS] EU gas storage 90% filling target (reference date) 
 — Compliance
DESCRIPTION:ACER Gas (ACER)\nType: Compliance\nStatus: Confirmed\nUnder Re
 gulation (EU) 2025/1733 the 90% storage target may be met any time betwee
 n 1 October and 1 December (replacing the former hard 1 November deadline
 )\, with limited deviations allowed\; in force through 2027. 1 November s
 hown as the reference benchmark.\nSource: https://energy.ec.europa.eu/top
 ics/energy-security/gas-storage_en
URL:https://energy.ec.europa.eu/topics/energy-security/gas-storage_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d98fbde4cba8@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261101
DTEND;VALUE=DATE:20261102
SUMMARY:[WCA] Annual compliance deadline (30% of prior-year emissions\, 5 
 p.m. PT) — Compliance
DESCRIPTION:Washington Cap-and-Invest (Washington Department of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nRemaining obligation due at the clos
 e of each four-year compliance period.\nSource: https://ecology.wa.gov/ai
 r-climate/climate-commitment-act/cap-and-invest/auctions-and-market/compl
 iance
URL:https://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-inve
 st/auctions-and-market/compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f5f6db6d2795@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261118
DTEND;VALUE=DATE:20261119
SUMMARY:[CCA] California-Quebec joint allowance auction (Q4 2026) — Aucti
 on
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Auction\nStatus: Confi
 rmed\nSource: https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-prog
 ram/auction-information
URL:https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-program/auction
 -information
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0c8d9c48570f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261118
DTEND;VALUE=DATE:20261119
SUMMARY:[QC_CAT] California-Quebec joint allowance auction (Q4 2026) — Au
 ction
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Auction
 \nStatus: Confirmed\nSource: https://www.environnement.gouv.qc.ca/changem
 entsclimatiques/marche-carbone_en.asp
URL:https://www.environnement.gouv.qc.ca/changementsclimatiques/marche-car
 bone_en.asp
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:211998bf6458@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261130
DTEND;VALUE=DATE:20261201
SUMMARY:[RINS] EPA statutory deadline to set the following year's RVO volu
 mes — Milestone
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Milestone\nStatus:
  Tentative\nEPA frequently misses this statutory date\; treat as a target
 \, not a fixed event.\nSource: https://www.congress.gov/crs-product/R43325
URL:https://www.congress.gov/crs-product/R43325
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fe3ce777be3f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261201
DTEND;VALUE=DATE:20261202
SUMMARY:[ISO_NE] Capacity Auction Reforms - seasonal/accreditation (CAR-SA
 ) filing expected — Milestone
DESCRIPTION:ISO New England (ISO-NE)\nType: Milestone\nStatus: Tentative\n
 ISO-NE expects to file CAR-SA with FERC in Q4 2026 (date provisional). Th
 e capacity market is moving to a prompt/seasonal design\; the next capaci
 ty auction is delayed to about February 2028 for the commitment period be
 ginning June 1\, 2028.\nSource: https://www.iso-ne.com/committees/key-pro
 jects/capacity-auction-reforms-key-project
URL:https://www.iso-ne.com/committees/key-projects/capacity-auction-reform
 s-key-project
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c015ece4605a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261202
DTEND;VALUE=DATE:20261203
SUMMARY:[RGGI] RGGI Auction 74 (Q4 2026) — Auction
DESCRIPTION:Regional Greenhouse Gas Initiative (RGGI\, Inc. / participatin
 g states)\nType: Auction\nStatus: Confirmed\nDec 2 per RGGI auction sched
 ule.\nSource: https://www.rggi.org/auctions/upcoming-auctions
URL:https://www.rggi.org/auctions/upcoming-auctions
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:673540a65058@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261202
DTEND;VALUE=DATE:20261203
SUMMARY:[WCA] Washington Cap-and-Invest quarterly auction (Q4 2026) — Auc
 tion
DESCRIPTION:Washington Cap-and-Invest (Washington Department of Ecology)\n
 Type: Auction\nStatus: Tentative\nFirst-Wednesday quarterly pattern\; con
 firm against Ecology's 2026 Summary of Expected Auction Dates.\nSource: h
 ttps://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-invest/a
 uctions-and-market
URL:https://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-inve
 st/auctions-and-market
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:67dea5d48713@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20261215
DTEND;VALUE=DATE:20261216
SUMMARY:[CA_OBPS] Regular-rate compensation deadline (excess emissions) —
  Compliance
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Compliance\nStatus: Confirmed\nIncreased-rate deadline follows in mi
 d-February\; CAD 110/t excess-emissions charge for 2026.\nSource: https:/
 /icapcarbonaction.com/en/ets/canada-federal-output-based-pricing-system
URL:https://icapcarbonaction.com/en/ets/canada-federal-output-based-pricin
 g-system
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dfa39c816124@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:[RGGI] RGGI Third Program Review cap takes effect (tighter 2027-20
 37 trajectory) — Effective date
DESCRIPTION:Regional Greenhouse Gas Initiative (RGGI\, Inc. / participatin
 g states)\nType: Effective date\nStatus: Confirmed\n2027 cap ~69.8M tons 
 (from 75.7M)\; CCR restructured\, offsets removed. Completed Jul 3\, 2025
 .\nSource: https://www.rggi.org/program-overview-and-design/program-review
URL:https://www.rggi.org/program-overview-and-design/program-review
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0c5f82021d38@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270215
DTEND;VALUE=DATE:20270216
SUMMARY:[PJM] Incremental Auction for the 2027/2028 Delivery Year — Aucti
 on
DESCRIPTION:PJM Interconnection (PJM Interconnection\, L.L.C.)\nType: Auct
 ion\nStatus: Tentative\nPJM announced a 2027/2028 Incremental Auction for
  February 2027\; the exact date is set in the RPM Auction Schedule.\nSour
 ce: https://www.pjm.com/-/media/markets-ops/rpm/rpm-auction-info/rpm-auct
 ion-schedule.ashx
URL:https://www.pjm.com/-/media/markets-ops/rpm/rpm-auction-info/rpm-aucti
 on-schedule.ashx
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:419e22b3a187@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270225
DTEND;VALUE=DATE:20270226
SUMMARY:[NESO] GB Capacity Market T-4 and T-1 auctions — Auction
DESCRIPTION:National Energy System Operator (Great Britain) (NESO)\nType: 
 Auction\nStatus: Tentative\nAnnual four-year-ahead (T-4) and one-year-ahe
 ad (T-1) capacity auctions\, typically held late February to early March\
 ; exact dates and parameters are set each cycle by DESNZ and NESO.\nSourc
 e: https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
URL:https://www.gov.uk/government/publications/capacity-market-auction-par
 ameters-letter-from-desnz-to-neso-february-2026
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6bc87bfbe322@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270228
DTEND;VALUE=DATE:20270301
SUMMARY:[EU_ETS] Free allocation entered in the Union Registry (approx.) 
 — Allocation
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Alloc
 ation\nStatus: Tentative\nTypically end of February\; confirm against the
  annual allocation timetable.\nSource: https://icapcarbonaction.com/en/et
 s/eu-emissions-trading-system-eu-ets
URL:https://icapcarbonaction.com/en/ets/eu-emissions-trading-system-eu-ets
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6a4d6341f108@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270301
DTEND;VALUE=DATE:20270302
SUMMARY:[RGGI] 2026 interim compliance true-up (allowance transfer deadlin
 e) — True-up
DESCRIPTION:Regional Greenhouse Gas Initiative (RGGI\, Inc. / participatin
 g states)\nType: True-up\nStatus: Tentative\nEarly-March window\, mirrori
 ng the 2025 interim cycle (transfer deadline Mar 2\, 2026).\nSource: http
 s://www.rggi.org/sites/default/files/Uploads/Compliance-Materials/RGGI_20
 25_Interim_Compliance_Checklist.pdf
URL:https://www.rggi.org/sites/default/files/Uploads/Compliance-Materials/
 RGGI_2025_Interim_Compliance_Checklist.pdf
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a6a01e1c7a80@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270315
DTEND;VALUE=DATE:20270316
SUMMARY:[TIER] Forecasting report update due (prior data year) — Reportin
 g
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-i
 nnovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a489467addb3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270326
DTEND;VALUE=DATE:20270327
SUMMARY:[MISO] Planning Resource Auction - offer window (last four busines
 s days of March) — Auction
DESCRIPTION:Midcontinent Independent System Operator (MISO)\nType: Auction
 \nStatus: Tentative\nMISO accepts PRA offers in the last four business da
 ys of March and posts results in late April (April 28 in 2026). Seasonal 
 accreditation applies\; exact days vary.\nSource: https://www.misoenergy.
 org/planning/resource-adequacy2/resource-adequacy/
URL:https://www.misoenergy.org/planning/resource-adequacy2/resource-adequa
 cy/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:bec96765788a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[AU_SAFEGUARD] Safeguard compliance deadline (surrender ACCUs / SM
 Cs for excess) — Compliance
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Compliance\nStatus: Confirmed\nNet emissions must be at or below
  baseline\; compliance assessed as of 1 April.\nSource: https://cer.gov.a
 u/about-us/our-compliance-approach/compliance-and-enforcement-priorities/
 compliance-and-enforcement-priorities-2025-26
URL:https://cer.gov.au/about-us/our-compliance-approach/compliance-and-enf
 orcement-priorities/compliance-and-enforcement-priorities-2025-26
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b5501482b787@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[BC_LCFS] Annual compliance report due (prior compliance year) — 
 Compliance
DESCRIPTION:BC Low Carbon Fuels (BC Ministry of Energy and Climate Solutio
 ns)\nType: Compliance\nStatus: Confirmed\nCompliance period aligns with t
 he calendar year\; reports due on or before March 31.\nSource: https://ww
 w2.gov.bc.ca/gov/content/industry/electricity-alternative-energy/transpor
 tation-energies/renewable-low-carbon-fuels/requirements
URL:https://www2.gov.bc.ca/gov/content/industry/electricity-alternative-en
 ergy/transportation-energies/renewable-low-carbon-fuels/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:49dfe3274bb7@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[EU_ETS] Report verified emissions for the prior year (Union Regis
 try) — Reporting
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Repor
 ting\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/c
 arbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:302833cf0e6f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[LCFS] Annual compliance / fuel pathway report due (prior data yea
 r) — Reporting
DESCRIPTION:Low Carbon Fuel Standard (CARB)\nType: Reporting\nStatus: Conf
 irmed\nSource: https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-s
 tandard/lcfs-registration-and-reporting
URL:https://ww2.arb.ca.gov/our-work/programs/low-carbon-fuel-standard/lcfs
 -registration-and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cb6c936f41d9@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[REC_HI] HI RPS annual status report to PUC (Docket 2007-0008) — 
 Reporting
DESCRIPTION:Hawaii RECs / RPS (Hawaii PUC / RPS program)\nType: Reporting\
 nStatus: Tentative\nHECO companies and KIUC file annual RPS status report
 s with the PUC under HRS 269-95\; 100% by 2045 on a net-generation basis 
 (Act 140\, 2022). Islanded grids - no external REC trading market. Exact 
 statutory filing date varies\; approximate marker.\nSource: https://puc.h
 awaii.gov/reports/energy-reports/renewable-portfolio-standards-rps-annual
 -reports/
URL:https://puc.hawaii.gov/reports/energy-reports/renewable-portfolio-stan
 dards-rps-annual-reports/
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:262081ae1afe@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[REC_ME] ME PUC annual RPS report (CEP compliance reports feed in)
  — Reporting
DESCRIPTION:Maine RECs / RPS (Maine PUC / RPS program)\nType: Reporting\nS
 tatus: Tentative\nMaine PUC publishes its annual RPS report to the Legisl
 ature ~Mar 31 (35-A M.R.S. 3210)\; competitive electricity providers self
 -report and settle RECs via NEPOOL GIS. Exact CEP filing date set by PUC 
 instructions.\nSource: https://www.maine.gov/mpuc/regulated-utilities/ele
 ctricity/renewable-programs/rps
URL:https://www.maine.gov/mpuc/regulated-utilities/electricity/renewable-p
 rograms/rps
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:79f1beb46105@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[REC_NY] NY Clean Energy Standard annual reconciliation (Tier 1/Ti
 er 4/ZEC) — True-up
DESCRIPTION:New York RECs / RPS (New York PUC / RPS program)\nType: True-u
 p\nStatus: Tentative\nPay-as-you-go: LSEs remit monthly obligation paymen
 ts to NYSERDA within 15 days of invoice\; after the Jan 1-Dec 31 complian
 ce year NYSERDA reconciles against final NYISO load. Annual reconciliatio
 n date varies\; ZEC runs on a fiscal-year basis. Tracked in NYGATS.\nSour
 ce: https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obl
 igations/Compliance
URL:https://www.nyserda.ny.gov/All-Programs/Clean-Energy-Standard/LSE-Obli
 gations/Compliance
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ba7ee9fd1e3a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[UK_ETS] Verified annual emissions report due — Reporting
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Reporting\nStatus: Confirmed\nSource: https://www.gov.uk/government/publi
 cations/participating-in-the-uk-ets/participating-in-the-uk-ets
URL:https://www.gov.uk/government/publications/participating-in-the-uk-ets
 /participating-in-the-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:949c9f271577@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:[WA_CFS] Q4 quarterly report due (prior year) — Reporting
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Reporting\nStatus: Confirmed\nQuarterly reports are due about 90 da
 ys after each quarter-end\; March 31 is the Q4 deadline.\nSource: https:/
 /ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/clean-fuel-
 standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0654dac62cec@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270401
DTEND;VALUE=DATE:20270402
SUMMARY:[REC_DC] DC RPS supplier compliance report due to DCPSC (prior cal
 endar year) — Compliance
DESCRIPTION:Washington DC RECs / RPS (Washington DC PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nDue by April 1 of the year following t
 he compliance year\; high-value solar carve-out (DC SRECs)\; DCMR Title 1
 5\, Ch. 29.\nSource: https://dcpsc.org/getattachment/Orders-and-Regulatio
 ns/Orders-Rules-and-Regulations/District-of-Columbia-Municipal-Regulation
 s-Title-1/15-29-Compiled-(Updated-April-2022).pdf.aspx?lang=en-US
URL:https://dcpsc.org/getattachment/Orders-and-Regulations/Orders-Rules-an
 d-Regulations/District-of-Columbia-Municipal-Regulations-Title-1/15-29-Co
 mpiled-(Updated-April-2022).pdf.aspx?lang=en-US
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6804df34f739@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270401
DTEND;VALUE=DATE:20270402
SUMMARY:[REC_MD] MD RPS supplier compliance report due to PSC (prior calen
 dar year) — Compliance
DESCRIPTION:Maryland RECs / RPS (Maryland PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nOn or before April 1 each supplier files its RPS
  report and retires Tier 1/Tier 1 solar/Tier 2 RECs\; COMAR 20.61.04.02.\
 nSource: https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-
 02
URL:https://www.law.cornell.edu/regulations/maryland/COMAR-20-61-04-02
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:11ff92fb8e27@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270415
DTEND;VALUE=DATE:20270416
SUMMARY:[REC_MO] MO RES annual compliance report due to PSC (prior calenda
 r year) — Compliance
DESCRIPTION:Missouri RECs / RPS (Missouri PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nInvestor-owned utilities (Ameren Missouri\, Ever
 gy\, Empire) file annual RES compliance reports and forward compliance pl
 ans under 20 CSR 4240-20.100\; 15% by 2021 with a 2% solar carve-out and 
 a 1% rate-impact cap\; RECs tracked in MRETS.\nSource: https://psc.mo.gov
 /electric/Renewable_Energy_Standard_Compliance_Reports
URL:https://psc.mo.gov/electric/Renewable_Energy_Standard_Compliance_Repor
 ts
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:80a863ec8564@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270415
DTEND;VALUE=DATE:20270416
SUMMARY:[REC_OH] OH renewable portfolio annual status report due to PUCO (
 prior year) — Compliance
DESCRIPTION:Ohio RECs / RPS (Ohio PUC / RPS program)\nType: Compliance\nSt
 atus: Confirmed\nEDUs and CRES providers file by April 15\; standard caps
  at 8.5% by 2026\; OAC 4901:1-40-05.\nSource: https://puco.ohio.gov/utili
 ties/electricity/resources/ohio-renewable-energy-portfolio-standard/rps-f
 iling-faqs
URL:https://puco.ohio.gov/utilities/electricity/resources/ohio-renewable-e
 nergy-portfolio-standard/rps-filing-faqs
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:13514174872d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270415
DTEND;VALUE=DATE:20270416
SUMMARY:[REC_WI] WI RPS annual compliance demonstration due to PSCW (prior
  calendar year) — Compliance
DESCRIPTION:Wisconsin RECs / RPS (Wisconsin PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nElectric providers demonstrate compliance by A
 pril 15 by retiring RECs/RRCs in M-RETS\; Wis. Stat. 196.378. Statewide 1
 0% goal (2015) met\; provider-specific baseline+6% requirements continue 
 indefinitely.\nSource: https://psc.wi.gov/Pages/ServiceType/Energy/Renewa
 bles/RpsCompliance.aspx
URL:https://psc.wi.gov/Pages/ServiceType/Energy/Renewables/RpsCompliance.a
 spx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1a8e5d7835fe@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270418
DTEND;VALUE=DATE:20270419
SUMMARY:[NG_FERC] FERC Form 2 / 2-A annual report due (interstate gas pipe
 lines) — Reporting
DESCRIPTION:FERC Natural Gas (FERC)\nType: Reporting\nStatus: Confirmed\nA
 nnual financial and operational report for major / non-major interstate n
 atural gas pipelines\; due April 18 of the following year under 18 CFR 26
 0.1-260.2.\nSource: https://www.ferc.gov/industries-data/natural-gas/indu
 stry-forms
URL:https://www.ferc.gov/industries-data/natural-gas/industry-forms
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:c3db0b512045@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:[CFR] Annual Credit Creation Report due (CATS) — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nCC1 and CC3 credits are created on April 30 with this report\; CI-Pa
 thway Reports share this deadline.\nSource: https://data-donnees.az.ec.gc
 .ca/data/climate/products/clean-fuel-regulations-credit-market-reporting?
 lang=en
URL:https://data-donnees.az.ec.gc.ca/data/climate/products/clean-fuel-regu
 lations-credit-market-reporting?lang=en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e9e329ec000e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:[OR_CFP] Annual compliance report due (balance credits and deficit
 s) — Compliance
DESCRIPTION:Oregon Clean Fuels Program (Oregon DEQ)\nType: Compliance\nSta
 tus: Tentative\nLCFS-family April 30 standard\; confirm on Oregon DEQ's C
 FP calendar. Quarterly progress reports are due about 90 days after each 
 quarter-end.\nSource: https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overv
 iew.aspx
URL:https://www.oregon.gov/deq/ghgp/cfp/pages/cfp-overview.aspx
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:2b31de7a913e@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:[UK_ETS] Surrender allowances for the prior scheme year — Complia
 nce
DESCRIPTION:UK Emissions Trading Scheme (UK ETS Authority / DESNZ)\nType: 
 Compliance\nStatus: Confirmed\nA double-surrender easing applies for the 
 2026-2027 maritime years (both due 30 April 2028).\nSource: https://icapc
 arbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
URL:https://icapcarbonaction.com/en/ets/uk-emissions-trading-scheme-uk-ets
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7828e8c49d18@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:[WA_CFS] Annual compliance report due (prior compliance year) — C
 ompliance
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nSource: https://ecology.wa.gov/air-c
 limate/reducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:487cd3bb90e0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270501
DTEND;VALUE=DATE:20270502
SUMMARY:[REC_MN] MN RES/Solar Standard REC retirement deadline (prior cale
 ndar year) — Compliance
DESCRIPTION:Minnesota RECs / RPS (Minnesota PUC / RPS program)\nType: Comp
 liance\nStatus: Confirmed\nRECs for the prior compliance year retired in 
 M-RETS by May 1\; annual verification report (RES\, Solar Energy Standard
 \, Green Pricing) filed with the PUC by June 1. 2023 law: 55% renewable b
 y 2035\, 100% carbon-free by 2040\; REC shelf life = generation year + 4.
 \nSource: https://mn.gov/commerce-stat/energy/industry-government/utiliti
 es/annual-reporting/notice_26-12_final_signed.pdf
URL:https://mn.gov/commerce-stat/energy/industry-government/utilities/annu
 al-reporting/notice_26-12_final_signed.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ce7c2dff3176@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270501
DTEND;VALUE=DATE:20270502
SUMMARY:[REC_VA] VA VCEA RPS annual development plan filed with SCC (Domin
 ion ~May 1) — Compliance
DESCRIPTION:Virginia RECs / RPS (Virginia PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nProceeding-based: Dominion (~May 1) and APCo (la
 te April) file annual RPS development plans (Va. Code 56-585.5(D))\; comp
 liance demonstrated by retiring RECs every year via PJM-GATS\; 100% by 20
 45 (Dominion) / 2050 (APCo)\; from 2025\, 75% of Dominion's RECs must be 
 Virginia-sited.\nSource: https://www.scc.virginia.gov/regulated-industrie
 s/utility-regulation/energy-regulation/renewable-resources/arbs/
URL:https://www.scc.virginia.gov/regulated-industries/utility-regulation/e
 nergy-regulation/renewable-resources/arbs/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1e9ce5893129@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:[CA_OBPS] Annual report and verification report due — Reporting
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Reporting\nStatus: Confirmed\nFederal OBPS now applies only in Manit
 oba\, PEI\, Yukon and Nunavut\; most large emitters sit under provincial 
 systems.\nSource: https://www.canada.ca/en/environment-climate-change/ser
 vices/climate-change/pricing-pollution-how-it-will-work/output-based-pric
 ing-system.html
URL:https://www.canada.ca/en/environment-climate-change/services/climate-c
 hange/pricing-pollution-how-it-will-work/output-based-pricing-system.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7ab4d1e09721@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:[QC_CAT] Annual verified GHG emissions report (SGE GES) — Reporti
 ng
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Reporti
 ng\nStatus: Tentative\nApproximate\; confirm the exact Quebec reporting d
 ate.\nSource: https://www.environnement.gouv.qc.ca/changementsclimatiques
 /marche-carbone_en.asp
URL:https://www.environnement.gouv.qc.ca/changementsclimatiques/marche-car
 bone_en.asp
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:36bda94f104d@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:[REC_CO] CO RES annual compliance report due to PUC (prior calenda
 r year) — Compliance
DESCRIPTION:Colorado RECs / RPS (Colorado PUC / RPS program)\nType: Compli
 ance\nStatus: Tentative\nQualifying retail utilities (Xcel/Public Service
 \, Black Hills) and wholesale utilities (Tri-State) file annual RES compl
 iance reports under PUC Rule 3662 (4 CCR 723-3) ~June 1\, plus forward co
 mpliance plans\; 30% by 2020 (IOUs)\; SB19-236 clean-energy 80% by 2030 /
  100% by 2050 goals\; WREGIS-tracked. Exact date approximate.\nSource: ht
 tps://puc.colorado.gov/utilityforms
URL:https://puc.colorado.gov/utilityforms
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ce0a88b9b464@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:[REC_IL] IL RPS delivery year begins (Jun 1-May 31) - IPA-procured
  — Milestone
DESCRIPTION:Illinois RECs / RPS (Illinois PUC / RPS program)\nType: Milest
 one\nStatus: Confirmed\nIllinois RPS is procurement-based: the Illinois P
 ower Agency procures RECs for ComEd/Ameren/MidAmerican via its Long-Term 
 Plan (Illinois Shines/ABP). Per-supplier ARES REC obligations phased out 
 after the 2018-19 delivery year. Indexed-REC procurements run on calendar
  years\; other procurements on the delivery year.\nSource: https://ipa.il
 linois.gov/renewable-resources.html
URL:https://ipa.illinois.gov/renewable-resources.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1c82115e4c30@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:[REC_OR] OR RPS annual compliance report due to OPUC (prior calend
 ar year) — Compliance
DESCRIPTION:Oregon RECs / RPS (Oregon PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nIOUs and electricity service suppliers file by June 
 1 (ORS 469A)\; consumer-owned utilities report to their boards/members\; 
 RECs retired via WREGIS\; ACP option under a 4% cost cap\; large utilitie
 s 50% by 2040 (SB 1547). RPS Implementation Plan filed Jan 1 of even year
 s.\nSource: https://www.oregon.gov/energy/energy-oregon/pages/renewable-p
 ortfolio-standard.aspx
URL:https://www.oregon.gov/energy/energy-oregon/pages/renewable-portfolio-
 standard.aspx
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4d3924fafb42@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:[REC_WA] WA Energy Independence Act annual report due to Commerce 
 (prior year) — Reporting
DESCRIPTION:Washington RECs / RPS (Washington PUC / RPS program)\nType: Re
 porting\nStatus: Confirmed\nQualifying utilities report annually by June 
 1 (RCW 19.285)\; the 15% renewable target was met (2020). CETA (RCW 19.40
 5) layers a 100%-clean-by-2045 obligation via 4-year Clean Energy Impleme
 ntation Plans and multi-year compliance periods (first CETA interim perfo
 rmance report due July 1\, 2026).\nSource: https://www.utc.wa.gov/regulat
 ed-industries/utilities/energy/conservation-and-renewable-energy-overview
 /washington-energy-independence-act-i-937
URL:https://www.utc.wa.gov/regulated-industries/utilities/energy/conservat
 ion-and-renewable-energy-overview/washington-energy-independence-act-i-937
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7e51ccb36ffc@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:[RINS] RFS attest engagement report (RFS 0304T) due — Reporting
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Reporting\nStatus:
  Tentative\nGenerally June 1 following the compliance year\; the exact ye
 ar tracks the compliance-deadline timing.\nSource: https://www.epa.gov/re
 newable-fuel-standard/extension-renewable-fuel-standard-compliance-deadli
 nes-final-rulemaking
URL:https://www.epa.gov/renewable-fuel-standard/extension-renewable-fuel-s
 tandard-compliance-deadlines-final-rulemaking
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:61956be40fdd@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:[WA_CFS] Credit Clearance Market window opens\, if required — Mil
 estone
DESCRIPTION:Washington Clean Fuel Standard (Washington Dept. of Ecology)\n
 Type: Milestone\nStatus: Tentative\nRuns June 1 to July 31\; held only if
  parties have unmet obligations (determined by May 15). Max price set by 
 the first Monday of April.\nSource: https://ecology.wa.gov/air-climate/re
 ducing-greenhouse-gas-emissions/clean-fuel-standard/requirements
URL:https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-emissions/c
 lean-fuel-standard/requirements
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4c639150a0a0@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:[CFR] Credit-adjustment report due — Reporting
DESCRIPTION:Clean Fuel Regulations (ECCC)\nType: Reporting\nStatus: Confir
 med\nSource: https://www.ccarbon.info/news/eccc-releases-detailed-factshe
 et-on-carbon-intensity-pathway-reports-for-clean-fuel-regulations/
URL:https://www.ccarbon.info/news/eccc-releases-detailed-factsheet-on-carb
 on-intensity-pathway-reports-for-clean-fuel-regulations/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eb85410628f3@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:[REC_MI] MI renewable energy annual compliance report due to MPSC 
 (prior year) — Reporting
DESCRIPTION:Michigan RECs / RPS (Michigan PUC / RPS program)\nType: Report
 ing\nStatus: Confirmed\nElectric providers retire RECs in MIRECS at year-
 end and file annual compliance reports in their renewable-energy-plan doc
 kets by June 30\; PA 235 (2023): RPS 50% by 2030\, 60% by 2035\, Clean En
 ergy Standard 100% by 2040\; REP plans filed biennially.\nSource: https:/
 /www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
URL:https://www.michigan.gov/en/mpsc/consumer/electricity/renewable-energy
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:afd4b49a074b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:[TIER] Verified annual compliance report and true-up obligation du
 e — Compliance
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Compliance\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-
 innovation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b4a839944850@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270701
DTEND;VALUE=DATE:20270702
SUMMARY:[CR_FERC_OIL] FERC oil pipeline index rate-ceiling adjustment take
 s effect — Effective date
DESCRIPTION:FERC Oil Pipeline Tariffs (FERC)\nType: Effective date\nStatus
 : Confirmed\nInterstate oil pipeline rate ceilings adjust each July 1 by 
 the FERC index (PPI-FG - 0.55% for the July 1\, 2026 - June 30\, 2031 ter
 m)\; FERC publishes the annual multiplier in May.\nSource: https://www.fe
 rc.gov/general-information-1/oil-pipeline-index
URL:https://www.ferc.gov/general-information-1/oil-pipeline-index
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:455c8a65766f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270701
DTEND;VALUE=DATE:20270702
SUMMARY:[REC_MA] MA RPS/APS annual compliance filing due to DOER (prior ca
 lendar year) — Compliance
DESCRIPTION:Massachusetts RECs / RPS (Massachusetts PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nCovers RPS Class I/II\, APS\, CES and 
 CPS\; due July 1 (or next business day)\; 225 CMR 14.09/15.09/16.09.\nSou
 rce: https://www.mass.gov/info-details/annual-compliance-reports-and-othe
 r-publications
URL:https://www.mass.gov/info-details/annual-compliance-reports-and-other-
 publications
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4cdc6380fbc6@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270701
DTEND;VALUE=DATE:20270702
SUMMARY:[REC_NM] NM Renewable Energy Act procurement plan + portfolio repo
 rt due to PRC — Compliance
DESCRIPTION:New Mexico RECs / RPS (New Mexico PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual procurement plan and prior-year portf
 olio report filed on a staggered schedule (El Paso Electric May 1\, PNM J
 une 1\, SPS July 1) under Rule 572 / 62-16-4 NMSA\; ETA 2019: 50% by 2030
 \, 80% by 2040\, 100% carbon-free by 2045\; WREGIS\; RECs carry forward u
 p to 4 years.\nSource: https://www.prc.nm.gov/utilities/renewable-energy/
URL:https://www.prc.nm.gov/utilities/renewable-energy/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:01ed61e89769@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270701
DTEND;VALUE=DATE:20270702
SUMMARY:[REC_NV] NV RPS annual compliance report due to PUCN (prior calend
 ar year) — Compliance
DESCRIPTION:Nevada RECs / RPS (Nevada PUC / RPS program)\nType: Compliance
 \nStatus: Confirmed\nProviders of electric service file by July 1 (NRS 70
 4.7825)\; 50% by 2030 / 100% carbon-free goal by 2050\; portfolio energy 
 credits (PECs)\; EE counts toward up to 10% (phasing out for 2025+).\nSou
 rce: https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
URL:https://puc.nv.gov/Renewable_Energy/Portfolio_Standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:4e7bfdb593ac@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270715
DTEND;VALUE=DATE:20270716
SUMMARY:[REC_NH] NH RPS annual compliance filing (Form E-2500) due to Dept
  of Energy — Compliance
DESCRIPTION:New Hampshire RECs / RPS (New Hampshire PUC / RPS program)\nTy
 pe: Compliance\nStatus: Confirmed\nFiled in the July 1-15 window (RSA 362
 -F:8 as amended by HB 2 sec. 112\, effective 2023)\; Classes I-IV\; NEPOO
 L GIS.\nSource: https://www.energy.nh.gov/renewable-energy/renewable-port
 folio-standard/renewable-portfolio-standard-compliance
URL:https://www.energy.nh.gov/renewable-energy/renewable-portfolio-standar
 d/renewable-portfolio-standard-compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b863d058f1d5@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270715
DTEND;VALUE=DATE:20270716
SUMMARY:[REC_RI] RI Renewable Energy Standard compliance filing due to PUC
  — Compliance
DESCRIPTION:Rhode Island RECs / RPS (Rhode Island PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nWithin 30 days after Q4 NEPOOL GIS repor
 ts (no later than July 15)\; ACP to the Renewable Energy Development Fund
 \; 810-RICR-40-05-2.\nSource: https://ripuc.ri.gov/utility-information/el
 ectric/rhode-island-renewable-energy-standard-ri-res-program
URL:https://ripuc.ri.gov/utility-information/electric/rhode-island-renewab
 le-energy-standard-ri-res-program
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:34a3e2a85827@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270801
DTEND;VALUE=DATE:20270802
SUMMARY:[REC_CA_PCC1] CA RPS Annual Compliance Report due to CPUC - PCC1 (
 bundled) — Compliance
DESCRIPTION:California RPS PCC1 (bundled\, delivered) (CPUC / CEC)\nType: 
 Compliance\nStatus: Confirmed\nPCC1 = RPS-eligible generation interconnec
 ted to / scheduled into a CA balancing authority (bundled\, delivered). R
 etail sellers (IOUs/ESPs/CCAs) file the Annual RPS Compliance Report by A
 ug 1 (D.12-06-038)\; measured over 3-year compliance periods\; WREGIS-tra
 cked\; SB 100: 60% by 2030.\nSource: https://www.cpuc.ca.gov/industries-a
 nd-topics/electrical-energy/electric-power-procurement/rps/rps-compliance
 -rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:75beab3f5d0f@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270801
DTEND;VALUE=DATE:20270802
SUMMARY:[REC_CA_PCC2] CA RPS Annual Compliance Report due to CPUC - PCC2 (
 firmed & shaped) — Compliance
DESCRIPTION:California RPS PCC2 (firmed & shaped) (CPUC / CEC)\nType: Comp
 liance\nStatus: Confirmed\nPCC2 = firmed-and-shaped / incremental electri
 city with substitute energy. Same Aug 1 CPUC Annual RPS Compliance Report
  (D.12-06-038)\; WREGIS-tracked.\nSource: https://www.cpuc.ca.gov/industr
 ies-and-topics/electrical-energy/electric-power-procurement/rps/rps-compl
 iance-rules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:10b30abeab86@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270801
DTEND;VALUE=DATE:20270802
SUMMARY:[REC_CA_PCC3] CA RPS Annual Compliance Report due to CPUC - PCC3 (
 unbundled RECs) — Compliance
DESCRIPTION:California RPS PCC3 (unbundled / TRECs) (CPUC / CEC)\nType: Co
 mpliance\nStatus: Confirmed\nPCC3 = unbundled RECs (TRECs) and products n
 ot qualifying as PCC1/PCC2 - the tradable category\, subject to a procure
 ment cap and portfolio-balance limits. Same Aug 1 CPUC Annual RPS Complia
 nce Report (D.12-06-038).\nSource: https://www.cpuc.ca.gov/industries-and
 -topics/electrical-energy/electric-power-procurement/rps/rps-compliance-r
 ules-and-process/rps-compliance-and-reporting
URL:https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/electr
 ic-power-procurement/rps/rps-compliance-rules-and-process/rps-compliance-
 and-reporting
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b60915c7fdfd@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270831
DTEND;VALUE=DATE:20270901
SUMMARY:[REC_VT] VT Renewable Energy Standard annual compliance filing due
  to PUC — Compliance
DESCRIPTION:Vermont RECs / RPS (Vermont PUC / RPS program)\nType: Complian
 ce\nStatus: Confirmed\nDistribution utilities file by Aug 31 (PUC Docket 
 8550)\; Tiers I/II met by retiring NEPOOL GIS RECs\, plus Tier III energy
  transformation. No retail choice in VT.\nSource: https://publicservice.v
 ermont.gov/renewables/renewable-energy-standard
URL:https://publicservice.vermont.gov/renewables/renewable-energy-standard
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:53c4cfa0481a@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270901
DTEND;VALUE=DATE:20270902
SUMMARY:[REC_NC] NC REPS/CEPS compliance plan + report due to NCUC — Comp
 liance
DESCRIPTION:North Carolina RECs / RPS (North Carolina PUC / RPS program)\n
 Type: Compliance\nStatus: Confirmed\nElectric power suppliers file the fo
 rward compliance plan (Rule R8-67(b)) and prior-year compliance report (R
 8-67(c)) by Sept 1\; retail-sales data entered into NC-RETS by June 1\; I
 OU target 12.5%\; expanded to CEPS by SL 2023-138\; RECs tracked in NC-RE
 TS.\nSource: https://www.ncuc.gov/Reps/reps.html
URL:https://www.ncuc.gov/Reps/reps.html
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:22f1f5f97e50@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270901
DTEND;VALUE=DATE:20270902
SUMMARY:[REC_PA] PA AEPS true-up period closes (Tier I/II + solar) — Comp
 liance
DESCRIPTION:Pennsylvania RECs / RPS (Pennsylvania PUC / RPS program)\nType
 : Compliance\nStatus: Confirmed\nThree-month true-up from the May 31 repo
 rting-year close\; after this the PUC verifies compliance and assesses AC
 P/SACP.\nSource: https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
URL:https://www.puc.pa.gov/media/1410/aeps-annreport2020.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f7fb2e125725@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270901
DTEND;VALUE=DATE:20270902
SUMMARY:[TIER] Facility-specific benchmark applications due (upcoming year
 ) — Deadline
DESCRIPTION:Alberta TIER (Alberta Environment and Protected Areas)\nType: 
 Deadline\nStatus: Confirmed\nSource: https://www.alberta.ca/technology-in
 novation-and-emissions-reduction-regulation
URL:https://www.alberta.ca/technology-innovation-and-emissions-reduction-r
 egulation
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dd35a8baf0ac@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270928
DTEND;VALUE=DATE:20270929
SUMMARY:[REC_DE] DE RPS compliance report due (~120 days after May 31 clos
 e) — Compliance
DESCRIPTION:Delaware RECs / RPS (Delaware PUC / RPS program)\nType: Compli
 ance\nStatus: Confirmed\nStandard-offer RPS obligation sits with Delmarva
 \; transitional-contract RECs transfer to the standard offer by Aug 1 (90
 %) and Sep 1\; 26 Del. Admin. C. 3008.\nSource: https://depsc.delaware.go
 v/rps-and-green-power-product-compliance/
URL:https://depsc.delaware.gov/rps-and-green-power-product-compliance/
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:14d17593328b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:[EU_ETS] Surrender allowances for the prior year's emissions — Co
 mpliance
DESCRIPTION:EU Emissions Trading System (European Commission)\nType: Compl
 iance\nStatus: Confirmed\nSource: https://climate.ec.europa.eu/eu-action/
 carbon-markets/eu-emissions-trading-system-eu-ets/union-registry_en
URL:https://climate.ec.europa.eu/eu-action/carbon-markets/eu-emissions-tra
 ding-system-eu-ets/union-registry_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:0f22d856b2ba@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271001
DTEND;VALUE=DATE:20271002
SUMMARY:[REC_NJ] NJ RPS annual compliance report due to BPU (EY Jun 1-May 
 31) — Compliance
DESCRIPTION:New Jersey RECs / RPS (New Jersey PUC / RPS program)\nType: Co
 mpliance\nStatus: Confirmed\nAnnual report demonstrating Class I\, Class 
 II and solar (SREC-II/SuSI) compliance for the prior Energy Year\; N.J.A.
 C. 14:8-2.2.\nSource: https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-
 19-15-8A.pdf
URL:https://nj.gov/bpu/pdf/boardorders/2015/20150819/8-19-15-8A.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:607a69e234df@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271015
DTEND;VALUE=DATE:20271016
SUMMARY:[REC_CT] CT RPS annual compliance filing (Exhibit A) due to PURA 
 — Compliance
DESCRIPTION:Connecticut RECs / RPS (Connecticut PUC / RPS program)\nType: 
 Compliance\nStatus: Confirmed\nDue Oct 15 of the year following the compl
 iance year (docket YEAR-06-01)\; Class I/II/III RECs settle via NEPOOL GI
 S by June 15.\nSource: https://portal.ct.gov/-/media/pura/electric/el-add
 s/master-rps--instructions---final92225.pdf
URL:https://portal.ct.gov/-/media/pura/electric/el-adds/master-rps--instru
 ctions---final92225.pdf
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:355f2e9d54af@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271031
DTEND;VALUE=DATE:20271101
SUMMARY:[AU_SAFEGUARD] NGER emissions and energy report due (prior financi
 al year) — Reporting
DESCRIPTION:Australia Safeguard Mechanism (Clean Energy Regulator / DCCEEW
 )\nType: Reporting\nStatus: Confirmed\nSource: https://www.dcceew.gov.au/
 climate-change/emissions-reporting/national-greenhouse-energy-reporting-s
 cheme/safeguard-mechanism
URL:https://www.dcceew.gov.au/climate-change/emissions-reporting/national-
 greenhouse-energy-reporting-scheme/safeguard-mechanism
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:fe893630404b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271101
DTEND;VALUE=DATE:20271102
SUMMARY:[CCA] Annual compliance obligation surrender (approx.) — Complian
 ce
DESCRIPTION:California Cap-and-Invest (CARB)\nType: Compliance\nStatus: Te
 ntative\nAnnual partial-surrender window\; full true-up at the close of e
 ach compliance period.\nSource: https://ww2.arb.ca.gov/our-work/programs/
 cap-and-trade-program
URL:https://ww2.arb.ca.gov/our-work/programs/cap-and-trade-program
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:f64fb169b22b@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271101
DTEND;VALUE=DATE:20271102
SUMMARY:[NG_ACER_GAS] EU gas storage 90% filling target (reference date) 
 — Compliance
DESCRIPTION:ACER Gas (ACER)\nType: Compliance\nStatus: Confirmed\nUnder Re
 gulation (EU) 2025/1733 the 90% storage target may be met any time betwee
 n 1 October and 1 December (replacing the former hard 1 November deadline
 )\, with limited deviations allowed\; in force through 2027. 1 November s
 hown as the reference benchmark.\nSource: https://energy.ec.europa.eu/top
 ics/energy-security/gas-storage_en
URL:https://energy.ec.europa.eu/topics/energy-security/gas-storage_en
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:61e99cd1d1a6@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271101
DTEND;VALUE=DATE:20271102
SUMMARY:[QC_CAT] Compliance-period allowance surrender (2024-2026 period) 
 — Compliance
DESCRIPTION:Quebec Cap-and-Trade (SPEDE) (MELCCFP (Quebec))\nType: Complia
 nce\nStatus: Tentative\nAllowances due by November following the end of t
 he compliance period\; confirm exact date.\nSource: https://icapcarbonact
 ion.com/en/ets/canada-quebec-cap-and-trade-system
URL:https://icapcarbonaction.com/en/ets/canada-quebec-cap-and-trade-system
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:dbc3a1babd45@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271101
DTEND;VALUE=DATE:20271102
SUMMARY:[WCA] Annual compliance deadline (30% of prior-year emissions\, 5 
 p.m. PT) — Compliance
DESCRIPTION:Washington Cap-and-Invest (Washington Department of Ecology)\n
 Type: Compliance\nStatus: Confirmed\nRemaining obligation due at the clos
 e of each four-year compliance period.\nSource: https://ecology.wa.gov/ai
 r-climate/climate-commitment-act/cap-and-invest/auctions-and-market/compl
 iance
URL:https://ecology.wa.gov/air-climate/climate-commitment-act/cap-and-inve
 st/auctions-and-market/compliance
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:eb3f5bb440ba@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271130
DTEND;VALUE=DATE:20271201
SUMMARY:[RINS] EPA statutory deadline to set the following year's RVO volu
 mes — Milestone
DESCRIPTION:Renewable Fuel Standard (RINs) (EPA)\nType: Milestone\nStatus:
  Tentative\nEPA frequently misses this statutory date\; treat as a target
 \, not a fixed event.\nSource: https://www.congress.gov/crs-product/R43325
URL:https://www.congress.gov/crs-product/R43325
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:64ef2ed13715@theknighted.com
DTSTAMP:20260801T200806Z
DTSTART;VALUE=DATE:20271215
DTEND;VALUE=DATE:20271216
SUMMARY:[CA_OBPS] Regular-rate compensation deadline (excess emissions) —
  Compliance
DESCRIPTION:Federal Output-Based Pricing System (GGPPA backstop) (ECCC)\nT
 ype: Compliance\nStatus: Confirmed\nIncreased-rate deadline follows in mi
 d-February\; CAD 110/t excess-emissions charge for 2026.\nSource: https:/
 /icapcarbonaction.com/en/ets/canada-federal-output-based-pricing-system
URL:https://icapcarbonaction.com/en/ets/canada-federal-output-based-pricin
 g-system
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR
